Quick MILL Andreja Premium Скачать руководство пользователя страница 2

Andreja Premium 

 

 

Introduction 

 

First of all, thank you for your business!   
 
You are going to love your Andreja Premium – it combines beauty, value, and great brewing for 
making the best espressos, cappuccinos, and lattes you’ve ever tasted! These instructions include 
hints that will help you get started quickly. 

First-time Setup  

 

  Remove the water reservoir and rinse with clean water. 

 

  Before filling the reservoir with tap water, test your water for hardness using the provided 

test strips. 

 

Fill a glass with cold tap water; dip the tip of the test strip into water for one second, then 
pull the strip out of the water and hold it horizontally for fifteen seconds.  After fifteen 
seconds, compare the color of the strip to the chart on the side of the package to determine 
how many grains of hardness is in your tap water. Three grains or less of hardness is 
acceptable. 
 

Note: 

Should your water’s hardness level exceed three grains, contact us to discuss your 

options for addressing this problem. 

 

  Fill the reservoir with water being careful not to overfill. 

 

Before plugging the machine in, verify the steam and hot water valves are closed. The brew 
lever should be pointing straight down. 

 

  Plug the machine in and turn the power switch to the on position.  

 

Your pump will start filling the boiler in approximately three seconds. Only allow the pump 
to run for 30 seconds and then turn the machine off for five minutes. Repeat this procedure 
of letting the pump run for 30 seconds and then turning the machine off for five minutes. It 
may take 4 cycles for the boiler to completely fill itself for the initial start up procedure. 

 
Important:

 If your machine’s pump is still running after the fourth 30-second interval, turn 

your machine off and call us. There is something wrong and further attempts could cause 
serious damage to your machine.  
 
When the pump stops, place either one of your portafilters into the group. Next, lift the brew 
lever to start the pump and keep the lever up until water comes out of the portafilter. Your 
machine’s heat exchanger is now full. 
 
The machine should now be heating up. Keep the portafilter locked into the group.  It will 
take approximately 10 minutes for the boiler to pressurize. You may hear some hissing and 
gurgling noises as the boiler heats up; this is normal. 

Содержание Andreja Premium

Страница 1: ...the Andreja Premium By Contents Introduction First time Setup Before Each Use Normal Operation Tips For Making Great Espresso How to Froth Milk for Cappuccinos and Lattes Regular Maintenance We re Her...

Страница 2: ...fill Before plugging the machine in verify the steam and hot water valves are closed The brew lever should be pointing straight down Plug the machine in and turn the power switch to the on position Yo...

Страница 3: ...about 0 2 bar between the high and low point For example if your machine is set so the maximum pressure is 1 2 bar green light illuminates the heating element should come on at 1 0 bar red light illum...

Страница 4: ...ngle shots This is because doubles are more forgiving if you have slight variations in the two previous variables quantity of ground coffee and tamp firmness Adjust your grind so that when you activat...

Страница 5: ...een 1 3 and full to have the maximum capacity for properly steaming milk If your pitcher has a spout fill it to half an inch below where the spout starts Stretching the milk refers to the initial heat...

Страница 6: ...m If there are a few bubbles in the milk after you have finished wait 5 10 seconds to allow all the remaining bubbles to surface then simply tap the edge of the pitcher on the counter and swirl the mi...

Страница 7: ...ce 1 3 of a teaspoon of espresso machine cleaner into the blank portafilter insert then lock the portafilter into the group Now follow the same procedure as above until the cleaner is dissolved and th...

Страница 8: ...1 Water reservoir 2 Steam valve knob 3 Water tap knob 4 Brew lever 5 Power switch power indicator green 6 Heating element indicators red and green 7 Boiler pressure gauge 8 Brew pressure gauge 9 Drip...

Отзывы: