6.0 Installation
There are two (2) components of the water treatment system to install and connect. These are
l
Electronic Control Box
l
Ioniser/Oxidiser/descaler Unit (Wet Cell)
Before commencing installation consider the length of the standard cables attached to the control box and their ability to easily reach the
Wet Cell. All cables are approximately 2 metres long.
The ideal sequence and flow for the water treatment
components is:
water in
Pump
Filter
Heater
Oxidiser
Descaler
Ioniser
Automatic
dosers
Pool
water out
Ioniser
Descaler
Air Duct
Keep clear of
obstructions
To
loniser
To
Oxidiser
To EM
Descaler
WARNING !
Only operate the Quest Q1 when you have the pool pump switched
on and you have water flowing through the ioniser ,oxidiser and
de-scaler chamber.
17
Oxidiser
Содержание Q1
Страница 1: ...Operators Installation Guide...
Страница 18: ...Installation Guide 16...
Страница 24: ...www questpools com au YOUR AUTHORISED QUEST RESELLER IS...