
HIGHWAY 66 FUNDAMENTALS
Pinsetter
Contrary to the ball being removed from the pit area and returned to the bowler, the pins
remain at the rear and are re-spotted for the next delivery. The equipment used to control
the flow of pins is called a pinsetter.
Each time a bowler rolls a ball, the pinsetter goes through a specific sequence of
operations. This sequence of operations is called the pinsetter cycle.
The various operations of the pinsetter are guided by the pinsetter electronics. The
pinsetter electronics distribute the electrical power to the various motors and components
as needed. Specifically, the pinsetter electronics activate the DC motor which transmits
power to the drawbar in order to raise or lower the pins to the playing surface. The
pinsetter electronics can be considered the brains of the pinsetter. From the time a bowler
has rolled the first ball, the electronics must be able to direct the pinsetter through its
different combinations of operations.
Each pair of pinsetters has an electric power box which is used in conjunction with the
coin mechanism activated by the introduction of the correct amount of money.
Note
The TMS pinsetter is supplied to operate on 240 volts, 50/60 cycles, single phase. The
electrical supply lines must conform to all electrical codes and it is the responsibility of
the proprietor to supply power to all the electrical components necessary for the normal
function of the pinsetters.
TMS Power Box
A power supply line is run from the main service circuit breaker distribution panel to a
junction box mounted above each pair of pinsetters. From each junction box, a three-
conductor drop cord (2-wires plus an insulated ground), terminating in a twist lock
connector, is plugged into the power box of each pair of pinsetters to supply the
necessary electrical power.
Attached to a panel which is mounted between each pair of pinsetters is the electric
power box used to supply the necessary electrical power to all components on a pair of
pinsetters. Unlike conventional electrical circuits, which are controlled through a
multitude of micro switches, all opening and closing of electrical circuits on the TMS
pinsetter and its accessories is done through the pinsetter control box using software and
optical reading devices (sensors and transmitters/receivers).
An on-off switch is located on the power box and is used to manually open and close the
thermal overload circuit breaker.
Warning
High voltage is present in the pinsetter power box. The main circuit breakers must
always be shut off or the twist lock plug disconnected prior to removing the power box
cover.
21
Содержание Highway 66
Страница 1: ...Copyright 2006 QubicaAmf Worldw ide Version 1 3...
Страница 2: ......
Страница 5: ......
Страница 14: ...INTRODUCTION TO HIGHWAY 66 Identifying Your Highway 66 System Components 14...
Страница 18: ......
Страница 28: ......
Страница 42: ......
Страница 46: ...TAKING CARE OF YOUR HIGHWAY 66 46...
Страница 47: ...TAKING CARE OF YOUR HIGHWAY 66 47...
Страница 58: ...WIRING DIAGRAMS General Wiring 58...
Страница 59: ...WIRING DIAGRAMS WIRING DIAGRAMS 59 Power Box Wiring 59...
Страница 60: ...WIRING DIAGRAMS Electronics Wiring 60...
Страница 61: ...WIRING DIAGRAMS Joystick Diagram 61...
Страница 62: ...WIRING DIAGRAMS Coin Mechanism Coin Comparator 62...
Страница 65: ...WIRING DIAGRAMS WIRING DIAGRAMS 65 Joystick control cable 65...
Страница 66: ...WIRING DIAGRAMS Power Box Connectors 66...
Страница 67: ...WIRING DIAGRAMS Q AMS Connectors 67...
Страница 68: ...WIRING DIAGRAMS I O Controller Connectors 68...
Страница 70: ...PARTS LISTING Safety Covers 70...
Страница 72: ...PARTS LISTING Bowling Pin Highway 72...
Страница 74: ...PARTS LISTING PARTS LISTING 74 Main Components 74...
Страница 76: ...PARTS LISTING Frame Assembly 76...
Страница 78: ...PARTS LISTING Drawbar Assembly 78...
Страница 80: ...PARTS LISTING PARTS LISTING 80 311 1100 00 DC Motor Assembly 80...
Страница 82: ...PARTS LISTING PARTS LISTING 82 9122015 Drawbar Shaft assembly 82...
Страница 84: ...PARTS LISTING PARTS LISTING 84 9122027 Reel Arm assembly 84...
Страница 86: ...PARTS LISTING 9122057 Pulley Detection Assembly 86...
Страница 88: ...PARTS LISTING PARTS LISTING 88 9122070 Pin Brake Assembly 88...
Страница 90: ...PARTS LISTING PARTS LISTING 90 9122220 Ten Pins Brakes Assembly 90...
Страница 92: ...PARTS LISTING PARTS LISTING 92 SB 043 01 Pulley Assembly 92...
Страница 94: ...PARTS LISTING 9166005 Table and Stabilization Assembly ME B03 94...
Страница 96: ...PARTS LISTING M 0701 25 Rear Ball Lift 96...
Страница 98: ...PARTS LISTING 98...
Страница 100: ...PARTS LISTING PARTS LISTING 100 SB 0701 30 Rear Ball Lift Assembly 100...
Страница 102: ...PARTS LISTING PARTS LISTING 102 SB 0540 75 Pit Cushion Assembly 102...
Страница 104: ...PARTS LISTING PARTS LISTING 104 122 3000 00 Ball Rack Assembly 104...
Страница 106: ...PARTS LISTING PARTS LISTING 106 133 3000 00 Ball Rack Hood Assembly 106...
Страница 108: ...PARTS LISTING PARTS LISTING 108 122 3100 00 Monitors and Supports Assembly 108...
Страница 110: ...PARTS LISTING 122 3100 02 LCD Supports Assembly 110...
Страница 112: ...PARTS LISTING PARTS LISTING 112 Q100 4500 Masking Unit 112...
Страница 114: ...PARTS LISTING Q100 4150 ONE TWO Ball Light 114...
Страница 116: ...PARTS LISTING Q100 4156 Stop Go LED 116...
Страница 118: ...PARTS LISTING 122 4600 115 Fluorescent Support 115 Vac 118...
Страница 120: ...PARTS LISTING 122 4600 220 Fluorescent Support 220 Vac 120...
Страница 122: ...PARTS LISTING PARTS LISTING 122 Q200 1010 00 Lateral Safety Guard 122...
Страница 124: ...PARTS LISTING PARTS LISTING 124 Electronic Components 124...
Страница 126: ...PARTS LISTING PARTS LISTING 126 SB 9802200 230 Power Box 126...
Страница 128: ...PARTS LISTING Power Box Front Panel 128...
Страница 138: ...PARTS NUMBER INDEX Z Q100 4156 STICKER 117 138...
Страница 139: ...INSTALLATION 139 Copyright 2006 QubicaAmf Worldw ide Version 1 3...
Страница 144: ...Step by step Chapter Overview Read carefully all the Warnings prior to begin installation 144...
Страница 151: ...INSTALLATION 151...
Страница 152: ...152...
Страница 153: ...INSTALLATION 153...
Страница 154: ...154...
Страница 155: ...INSTALLATION 155...
Страница 156: ...156...
Страница 157: ...INSTALLATION 157...
Страница 158: ...158...
Страница 159: ...INSTALLATION 159...
Страница 160: ...160...
Страница 161: ...INSTALLATION 161...
Страница 162: ...162...
Страница 163: ...INSTALLATION 163...
Страница 164: ...164...
Страница 165: ...INSTALLATION 165...
Страница 166: ...166...
Страница 167: ...INSTALLATION 167...
Страница 168: ...168...
Страница 169: ...INSTALLATION 169...
Страница 170: ...170...
Страница 171: ...INSTALLATION 171...
Страница 172: ...172...
Страница 173: ...INSTALLATION 173...
Страница 174: ...174...
Страница 175: ...INSTALLATION 175...
Страница 176: ...176...
Страница 177: ...INSTALLATION 177...
Страница 178: ...178...
Страница 179: ...INSTALLATION 179...
Страница 180: ...180...
Страница 181: ...INSTALLATION 181...
Страница 182: ...182...
Страница 183: ...INSTALLATION 183...
Страница 184: ...184...
Страница 185: ...INSTALLATION 185...
Страница 186: ...186...
Страница 187: ...INSTALLATION 187...
Страница 188: ...188...
Страница 189: ...INSTALLATION 189...
Страница 190: ...190...
Страница 191: ...INSTALLATION 191...
Страница 192: ...192 Gutter installation Pictures Picture 1 Picture 2...
Страница 193: ...INSTALLATION 193 Picture 3 Picture 4...
Страница 194: ...194 Picture 5...
Страница 195: ...INSTALLATION 195 Picture 6 Picture 7 Picture 8...
Страница 196: ...196 Picture 9...
Страница 197: ...INSTALLATION 197 Picture 10...
Страница 198: ...198 Picture 11 Picture 12...
Страница 199: ...INSTALLATION 199 Picture 13...
Страница 200: ...200...