Commissioning
QUBEV-UG-02 Installation and Operation Manual
QubEV
September 2020
Page
11
of
15
NOTE:
All electrical work must be performed in accordance with the current Electrical Wiring
Regulations.
12.
Route the power supply cable to the appropriate length to be able to connect to the
terminals.
13.
Terminate the supply cable in the appropriate manner and connect to the pedestal as per
the appropriate schematic.
14.
Make sure ALL cable connections are secure and have not become loose or damaged in
transit or during installation.
15.
Make sure ALL debris is removed from the front and rear halves of the charger body and
that no debris is present on any of the components.
IMPORTANT NOTE:
It is the responsibility of the installing engineer to satisfy themselves, that all cable
terminations throughout this product are secure and tight and have not become loose,
strained, or disconnected during transit and/or installation.
Commissioning
WARNING: Electrical Power
Make sure it is safe to apply electrical power to the charger.
Set the Charger Power
By default the QubEV charger is set to 32 Amps. If a lower power is required, refer to the steps
below:
1.
Carefully remove the cover of the Charge Control Unit and locate the Amp Setting ‘DIP’
switches. Refer to Figure 5 Charge Control Unit.
2.
Set the switches to the appropriate position for the required power rating:
WARNING: Electrical Power
Switches must only be set by a qualified electrical installer. Incorrect setting may lead to
equipment damage and/or personal injury. The current rating must not exceed the supply
rating.
Carefully squeeze the top and bottom faces of
the Charge Control Unit (as indicated by the
green arrows) and ease the top cover away.
With the cover removed, the DIP switches can
be seen toward the bottom edge of the unit.
Make sure to refit the cover when setting is
complete.
The setting may be recorded for future
reference on the next page:
Figure 5 Charge Control Unit
Cover
Fitted
Cover
Removed