Commissioning 

 

 

 

QUBEV-UG-02  Installation and Operation Manual 

 

QubEV 

September 2020 

 

Page 

11

 of 

15

 

NOTE: 

All electrical work must be performed in accordance with the current Electrical Wiring 

Regulations.

 

12.

 

Route the power supply cable to the appropriate length to be able to connect to the 

terminals. 

13.

 

Terminate the supply cable in the appropriate manner and connect to the pedestal as per 

the appropriate schematic. 

14.

 

Make sure ALL cable connections are secure and have not become loose or damaged in 

transit or during installation. 

15.

 

Make sure ALL debris is removed from the front and rear halves of the charger body and 

that no debris is present on any of the components. 

IMPORTANT NOTE: 

It is the responsibility of the installing engineer to satisfy themselves, that all cable 

terminations throughout this product are secure and tight and have not become loose, 

strained, or disconnected during transit and/or installation. 

Commissioning 

WARNING: Electrical Power 

Make sure it is safe to apply electrical power to the charger. 

Set the Charger Power 

By default the QubEV charger is set to 32 Amps. If a lower power is required, refer to the steps 

below: 

1.

 

Carefully remove the cover of the Charge Control Unit and locate the Amp Setting ‘DIP’ 

switches. Refer to Figure 5 Charge Control Unit. 

2.

 

Set the switches to the appropriate position for the required power rating: 

WARNING: Electrical Power 

Switches must only be set by a qualified electrical installer. Incorrect setting may lead to 

equipment damage and/or personal injury. The current rating must not exceed the supply 

rating. 

 

Carefully squeeze the top and bottom faces of 

the Charge Control Unit (as indicated by the 

green arrows) and ease the top cover away. 

 

With the cover removed, the DIP switches can 

be seen toward the bottom edge of the unit. 

 

Make sure to refit the cover when setting is 

complete. 

 

The setting may be recorded for future 

reference on the next page: 

 

 

 

 

 

Figure 5 Charge Control Unit 

 

Cover 

Fitted 

Cover 

Removed 

Содержание EVON0010

Страница 1: ...some useful hints and tips as we want your experience with the QUBEV to be as smooth as possible Model No EVON0010 EVON0040 REF QUBEV UG 02 INSTALLATION USER GUIDE UNIVERSAL ELECTRIC VEHICLE CHARGER...

Страница 2: ...Code QUBEV UG 02 Language UK English Original Date Published November 2020 QubEV are the publishers of this document and own the rights to use the text images and all technical content contained withi...

Страница 3: ...s 6 Typical Options 7 Installation 7 Before Installation 7 Labelling 8 Schematics 8 Installation Procedure 10 Commissioning 11 Set the Charger Power 11 AMP Setting Record 12 Testing 12 After Installat...

Страница 4: ...r to property caused by improper installation are the responsibility of the installer x The information provided in this manual must ONLY be used with the model s listed on page 2 of this manual x The...

Страница 5: ...OTES are given to provide additional information and or to highlight information of importance They will be given either before or after the detail instructions as appropriate and may use different wo...

Страница 6: ...21 2002 EN 61851 22 2002 Wiring Regulations BS 7671 IET EV Regulations Glow Wire Testing IEC 60695 2 13 EMC Compliance 2014 30 EU EN 61000 6 3 2007 EN 61000 6 2 2005 Safety Compliance EN 60950 1 2006...

Страница 7: ...urther advice and or training BEFORE attempting installation operation of the equipment x The manufacturer distributor cannot accept any responsibility for improper installation or any problems arisin...

Страница 8: ...al Page 8 of 15 November 2020 Labelling Installers must observe any all warning labels displayed on the equipment or inside the equipment enclosure Figure 2 Product Label Schematics Figure 3 EVON0010...

Страница 9: ...tion and Operation Manual QubEV September 2020 Page 9 of 15 Figure 4 EVON0040 Schematic Diagram EARTH IN ACCORDANCE WITH CURRENT REGULATIONS Appropriate cabling between the consumer unit and charger m...

Страница 10: ...and internal components x Components that have come away from the DIN rail may be refitted to the rail if there is no damage to the component or its securing mechanism IMPORTANT Items damaged in trans...

Страница 11: ...cted during transit and or installation Commissioning WARNING Electrical Power Make sure it is safe to apply electrical power to the charger Set the Charger Power By default the QubEV charger is set t...

Страница 12: ...__ Signature _________________________ Date ______________________________ 3 Installers may add their name and the date of installation setting as a record of the work 4 Refit the Charge Control Unit...

Страница 13: ...Light No power to charger or Charger fault Steady Blue Charger available and ready to be connected to vehicle Flashing Blue Connection is okay Steady Green Charging Flashing Green Charging complete S...

Страница 14: ...a functional test of the switchgear if installed every six months by pressing the test button and making sure that the switchgear deactivates x If the equipment fails the test isolate the equipment an...

Страница 15: ...orage incorrect installation accident inappropriate use or cleaning of the SURGXFW UHORFDWLRQ RI WKH SURGXFW DIWHU LWV UVW LQVWDllation abuse misuse or if it has been used or PDLQWDLQHG LQ D PDQQHU QR...

Страница 16: ...British by Design SIMPLE COMPACT AFFORDABLE Images are for marketing purposes only and are not contractual...

Отзывы: