LOFT
54F01003C
Quax nv
Karel Picquélaan 84 B-9800 Deinze Belgium
T
T
0032 9 380 80 95 www.quax.eu -
E
E
30
Step 4.3
: Changing the slatted bed base position
Loosen the bolts (
G
) and remove the slatted frame. Move the eye pins (
H
) to another position at the same height and
repeat step
4.2
.
Step 4.2
: Use the assembled bed of step
4.1
, the slatted frame
P3
, four nuts
F
and four bolts
G
Place the slatted frame (
P3
) on the eye pins of the headboards. Push the nuts (
F
) through the eye pins and the drillings
at the bottom of the base. Push the bolts (
G
) through the holes on top of the bottom and tighten in the nuts.