background image

BOILING

CHILLED

SPARKLING

HOT & COLD

Touch

INSTALLATION
GUIDE

Содержание PureH2O Touch

Страница 1: ...BOILING CHILLED SPARKLING HOT COLD Touch INSTALLATION GUIDE...

Страница 2: ...PRE INSTALLATION CHECK LIST 3 TYPE AA AIR GAP 4 INSTALLATION 5 UNPACKING YOUR EQUIPMENT 5 INSTALLING THE QUATREAU TOUCH TAP 5 INSTALLING THE QT553 B boiler control module 7 INSTALLING THE CS20 8 IMPO...

Страница 3: ...ed Mains Cold Water that will be used to feed a cold supply to the system 4 Drainage An approved Type AA fitting air gap must be used for the Venturi waste Either a trapped upstand or drain clamp can...

Страница 4: ...le water device The interconnection pipe must run downhill as shown here into the Airgap connection Stage 2 provides a secondary non return valve in the grey adaptor whilst stage 2 provides an air gap...

Страница 5: ...and electrical connection that will be in a plastic bag inside the packing A contents list will explain what should be included and what the parts are used for PRIOR TO INSTALLATION WE RECOMMEND THAT...

Страница 6: ...nel faces forward towards the user position 180 degrees to the sink Now you can tighten the nuts until you have a firm fixing on both sides The comms cable hangs down and will connect into the QT553 B...

Страница 7: ...ust flow for mains hot and cold if the thermostatic valve is out of reach This will control the cold water mains feed that is fitted to the left rear low level fitting labeled cold mains inlet It will...

Страница 8: ...he boiler unit at the back Push gently until it clicks in Connect the power lead but do not turn on at this stage QUATREAU TOUCH INSTALLING THE CS20 Before installation of the chiller unit refer to th...

Страница 9: ...ontrol unit 3 Install Thermostatic mixing valve and set to maximum temperature then reduce by 1 2 turn for 40C set point Connect the hot and cold feeds with isolators 4 Install Drain off saddle with t...