ACTIV
A
TION & RENEW
AL
5
48
5.2 First Time Activation Details
As mentioned in section 5.1 above, if this is the first time you are powering the Game Gate
VU you must activate the equipment. Prior to activation the system will default to Free Play
Mode and Standard Play Mode (able to charge for play) will be disabled. The unit can also be
changed to Tradeshow Mode prior to activation (see Section 6).
Please follow these steps carefully.
You will need: USB flash drive and a computer with internet access
2GB
USB Flash Drive x 1
PART#2097391
2. You will receive a login and password from the license manager to access the Game Gate
registration server (http://www.gamegatecontrol.com). Your login and password will be sent to
you by mail and email.
3. Plug in your new Game Gate VU to a power outlet and follow the prompts, which will save
an important file to the included USB flash drive (called “control.gamegate”).
4. Use a PC to login to your account. Register and activate the new machine by uploading
the file “control.gamegate” from the USB flash drive into the registration server (see section
5.2 for more details, you must browse for this file on your PC).
5. The registration server will modify the uploaded file “control.gamegate” and ask you to
save it back to your computer.
6. Save the new “control.gamegate” file to your computer and copy the file to the USB flash
drive, overwriting the previous version of the file.
7. Take the newer file, which is now on the USB flash drive and insert it into the USB port on
the Game Gate VU you want to activate. Follow the steps detailed in 5.2 below to finish the
activation, which is valid for 6 months of operation. Note, this process will also update the
Game Gate firmware if a new version is available. Attract videos should also be uploaded.
8. Thirty days prior to expiration you will receive an invoice for another 6 months of license.
Pay the invoice and credits will be added to the registration server. Follow steps detailed in
5.3 to apply the credits and extend the license so that operation will continue. This process
will repeat every 6 months for the life of the product.
Содержание GAME GATE VU
Страница 1: ...TM MODEL OWNER S MANUAL...
Страница 2: ......
Страница 101: ...This page is intentionally left blank...
Страница 102: ...Extra bill accpetor scan sheets...
Страница 103: ...This page is intentionally left blank...