17.  All electrical wiring must comply with BS7671 and local by-laws, all components where applicable should be provided with 

all the necessary safety protection and isolating devices. 

18.  Connect pipe work to the unit refer to fig. 9 for connection detail. 
19.  Once the units are fitted in position prior to commissioning they must still be protected from damage. 

 

 
CONNECTION OF DUCTWORK TO QUARTZ DUCTED FANCOILS 
 

Note:

   The provided ducts are there as a means of connecting the ductwork to the fan coil. Following the below steps will ensure 

 

trouble free installation. All ductwork must be in line with the spigots on the unit before securing in position. The ducts 

 

must slide over the spigot connections without having to use excessive force. 

       

Note:

   Having to force the duct work to line up with the spigots may cause damage to the spigots and dislodge them from there 

 

fixings. 

 
 
 

             Typical installation  
              showing ductwork  
              connected to unit 
 

 
 
 
 

 
 
 
 
 
 

 
 
 
 
The ducts should be pushed fully over the spigot up to the outer casing of the unit and secured to the spigot with screws, 
once fitted they should be then sealed around the end of the duct and the outer casing of the fan coil. 

  

IMPORTANT. 
The spigots on the unit are there for the sole purpose of providing a connection for the ductwork to the unit. They are not 
designed to support the weight of the ductwork and all duct work should be installed square to the spigots this will 
eliminate the need for excessive force to make the connection. Duct work should be installed in accordance with CIBSE 
HVCA DW144 : Specification for sheet metal duct work. 

     

 

                                

 
 

 
 
 
 
 
 
 
 
 
               
 
 
 

 

 

 

 

 

 

 

Fig. 8 

 
All units must be installed in accordance with good engineering standards. 

 
 
 

 
 

T Bar Grid False Ceiling
with 10 mm Thick Fibre Board

Roof

Return Air Grille or Diffuser
Must not be positioned directly
below the unit intakes

Fresh Air Supply Duct

Ceiling Void

Fan Coil Unit

Internal Room

Accoustically Lined Diffuser

Plenum

Minimum 1 Metre Length Of

Acoustic Flexible Ducting

Содержание Amber Series

Страница 1: ...Units Designed for Ceiling or Void Mounting INSTALLATION OPERATION MAINTENANCE INSTRUCTIONS TEV Ltd Armytage Road Brighouse West Yorkshire United Kingdom HD6 1QF UK Tel 01484 405630 Fax 01484 405620...

Страница 2: ...e used 4 It is manually isolated from the electrical mains supply 5 Electrical equipment is earthed to comply with IEE regulations and local by laws 6 All electrical work must be carried out by a Qual...

Страница 3: ...ntation 5 Filters 5 INSTALLATION Dimensional details 6 Pre Unit Installation 7 Fitting unit 7 Fitting float switch 7 9 Connection of ductwork 9 COMMISIONING Airside Measuring and Balancing 10 Electric...

Страница 4: ...s AC Speed control of the fan motors is achieved by means of a multitapped auto transformer which is wired to a three speed and fine adjustment switches Supplied with continuous filament media filters...

Страница 5: ...aged Maintenance It is essential that the following instructions as laid down in this section are carried out and maintained during the period of storage before commissioning Internal Surfaces If duct...

Страница 6: ...B Spigot Options Weight approx Kg AMB 1 630 595 1 2 3 4 37 AMB 2 880 845 1 2 3 4 45 AMB 3 1230 1195 1 2 3 4 5 55 AMB 4 1230 1195 1 2 3 4 5 60 AMB 5 1430 1395 1 2 3 4 5 70 AMB 6 1430 1395 1 2 3 4 5 75...

Страница 7: ...unit up using a spirit level checking to ensure the unit sits level in both directions the drip tray is designed with a built in fall to ensure condensation runs to the drain connection 7 Use nuts and...

Страница 8: ...nt pipe is higher than the water level in the drip tray 13 The drain pipe from the condensate pump must be run to a common drain It is important that any condensate pump installed must be in accordanc...

Страница 9: ...Typical installation showing ductwork connected to unit The ducts should be pushed fully over the spigot up to the outer casing of the unit and secured to the spigot with screws once fitted they shou...

Страница 10: ...ation of the condensation pump by pouring a small amount of water into the drain tray and ensure the pump clears any water and operates any alarms etc 13 Start the fan and blow through the system thor...

Страница 11: ...ice and maintenance of Quartz fan coil units and must be read before any maintenance is attempted WARNING It is essential that before any work is carried out the unit is isolated externally from the e...

Страница 12: ...ws and slide element upwards letting the screw head pass through the key hole slots 5 Remove wires from element take note of terminal connections used 6 Remove elements from the unit must be replaced...

Страница 13: ...irty filters will reduce the air volume handled by the unit thus adversely affecting its performance The length of time between cleaning of filters is dependant upon the environment A six to twelve mo...

Страница 14: ...emperatures Alternatively Electric Heating elements are available and can be supplied wired for single phase or three phase supply as appropriate or as specified Multiple units fitted on the same syst...

Отзывы: