Chapter 4: Site Preparations
High-density Expansion Module Requirements
Scalar i6000 Planning Guide
85
High-density Expansion Module Requirements
Add.
Additional Comments
Record any additional information from other pages. For reference
purposes, note the page number with the information. Add and
number additional sheets as necessary.
Requirement
Scalar i6000
— Scalar i2000 libraries must be upgraded to
Scalar i6000 before upgrading to Gen 2 robotics.
No DLT tape drives, media, or magazines
— Gen 2
robotics libraries do not support DLT tape drives or media.
Remove these from the library before the upgrade.
Requirement
Scalar i6000
— Scalar i6000 libraries must be upgraded to
i11 before an HDEM can be added.
The Scalar i6000 library must contain a Gen 2 Robotics
and Electronics Kit to support an HDEM.
Содержание Scalar i6000
Страница 1: ...Planning Guide Quantum Scalar i6000 Library 6 66882 07 Rev A...
Страница 6: ...Contents vi Scalar i6000 Planning Guide...
Страница 54: ...Chapter 2 Description Encryption and Key Management Solutions 48 Scalar i6000 Planning Guide...
Страница 92: ...Chapter 4 Site Preparations Additional Comments 86 Scalar i6000 Planning Guide...