background image

Quantum DX-Series: Optional X520 Network Card Installation Instructions
6-67765-01 Rev C
March 2014

4

Opening the Node Cover

2

Select 

Shutdown

 and click 

Apply

.

3

Close the browser window.

4

After the Node shuts down, turn off both power switches on the back of 

each Array or Expansion module (if any).

Note:

For detailed information about shutting down Array or Expansion 

modules, see the 

User’s Guide

 for your DXi system.

Opening the Node Cover

To remove the DXi Node from the rack and remove the top cover:

WARNING:

Opening or removing the system cover when the system is on 

may expose you to a risk of electric shock.

Caution:

Use appropriate ESD precautions, including the use of a grounding 

strap, when working inside the Node.

1

If installed, remove the front bezel by lifting the latch on the left side of the 

bezel.

2

Disconnect all power, SAS, Ethernet, and Fibre Channel cables from the rear 

of the Node. Make sure to label the cables so they can be easily identified 

when they are re-connected to the Node after the upgrade procedure is 

complete.

3

Press the locking tab on either side of the Node, and pull the Node out from 

the rack until the inner rails lock.

Note:

If necessary, remove the optional screws securing the Node to the 

front of the rack (behind the locking tab).

4

Locate the lock levers on the sides of the inner rails (see 

Figure 4

). Unlock 

each lever by rotating it up to its release position.

Содержание Optional i350 Quad Port 1 GbE Card

Страница 1: ...configurations Dual port 10 GbE X520 card Provides two 10 GbE SFP Ethernet ports for supported DXi4xxx configurations DXi4700 or higher or for supported DXi6xxx configurations DXi6800 or higher see Fi...

Страница 2: ...he System on page 12 Preparing for the Upgrade WARNING To prevent the risk of electrical shock bodily injury or damage to the equipment read all instructions and warnings in the Quantum Products Syste...

Страница 3: ...hipping bag or on an antistatic mat Wear anti static wrist bands when unpacking and handling the units and avoid touching connectors and other components Note Dry climates and cold weather heating env...

Страница 4: ...lectric shock Caution Use appropriate ESD precautions including the use of a grounding strap when working inside the Node 1 If installed remove the front bezel by lifting the latch on the left side of...

Страница 5: ...J slots 6 Lift the Node up and away from the rack and place it on a flat stable surface WARNING The DXi Node including hard drives weighs more than 50 pounds 22 7 kg A minimum of two people are requir...

Страница 6: ...ch release lock counterclockwise to the unlocked position see Figure 6 Figure 6 Removing the Node Cover 9 Lift the latch on top of the Node and slide the cover back 10 Grasp the cover on both sides an...

Страница 7: ...in three expansion card risers Install the optional network card in the correct slot in expansion card riser 1 see Figure 8 Supported DXi4xxx Models DXi4700 and higher Install the optional network ca...

Страница 8: ...the system board see Figure 9 Figure 9 Removing and Installing the Expansion Card Riser 1 2 Press the tab to release the expansion card latch and rotate the latch away from the expansion card riser s...

Страница 9: ...e expansion card connector 5 Insert the card edge connector firmly into the expansion card connector until the card is fully seated Make sure the card is inserted into the correct slot Supported DXi4x...

Страница 10: ...Replacing the Node Cover 2 Place the cover onto the Node chassis and offset the cover slightly back so that it clears the chassis hooks and lays flush on the chassis 3 Push down the latch to move the...

Страница 11: ...arely aligned with the rack as you slide it in 9 If applicable replace the front bezel by inserting the right side of the bezel into the slots on the Node and then snapping the left side of the bezel...

Страница 12: ...on the rear of the module displays 99 approximately 120 seconds 2 Press the power button on the front of the Node see Figure 13 Wait for the system to boot This can take up to 30 minutes Figure 13 No...

Отзывы: