Section 4B:
Connecting and using solar panels.
Step 1: Be sure both circuit-breakers to the solar charge controller are
switched off.
Step 2: Connect the jack from the panels into the port on the generator base
unit.
Step 3: It is very important to switch the charge controller to battery bank
circuit-breaker (bottom one) on first, then the charge controller to solar panel
circuit-breaker (upper one) on next.
Switch this breaker on
first.
Switch this breaker on
next.
(Breakers shown in off (open) position. To switch on, rotate the red levers down until they
latch. To switch off, press red button to left of red lever.)
14