Once the time display is set to 12:01 PM, press the “extra cycle button once as shown in the 
photo below. 
 

 

Extra cycle button 
 

 

To enter master programming mode, press the UP and DOWN buttons together and hold for 
5 seconds, and then release the buttons, as shown in picture below. 
 

 

 
The display should now show DF GAL as shown in the picture below. This indicates United 
States gallons. 

Do not change this value, and press the Extra Cycle Button once to continue

.  

 

Содержание Fleck 5600 SXT

Страница 1: ...nnect to the softener for use during each regeneration Standard US plug 120v 60hz the softener system includes a 5ft power cord and plug Be sure the plug is not connected to a light switch Make a list...

Страница 2: ...er and lead free solder An average cost of 40 00 NOW THAT YOU HAVE ADDED THE RESIN AND CONNECTED THE CONTROL VALVE TO THE TANK YOU ARE READY TO INSTALL FOLLOW THESE INSTRUCTIONS 1 Turn off the main wa...

Страница 3: ...valve meter assembly and secure it with the two small stainless steel clamps 7 Now position the water softener unit in place for final water line installation making sure the bypass valve is set in t...

Страница 4: ...e to a house drain where your washing machine drain line goes is an excellent choice if this is not possible then you can drain into multiple areas make sure you always leave an air gap if going into...

Страница 5: ...flow with water The safety float does not dictate the water level in your brine tank Measure from the top of the air check shown as 1 10 to bottom of float show as 2 in photo below you may have to gen...

Страница 6: ...the whole in the brine tank and into the brine well Slip the plastic nut and the two ferules one black and one white over brine tubing then push brass insert and screen into brine tubing as shown in...

Страница 7: ...have it tested Your Hardness test results may indicate GPG PPM or Mg L It is important to note that PPM and Mg L are the same measure and both figures can be treated interchangeably If you get a hard...

Страница 8: ...on once as shown in the photo below Extra cycle button To enter master programming mode press the UP and DOWN buttons together and hold for 5 seconds and then release the buttons as shown in picture b...

Страница 9: ...ange this value and press the Extra Cycle Button once to continue The display should now show CT Fd as shown in the picture below This indicates Control Type Meter Delayed Do not change this value and...

Страница 10: ...the Extra Cycle Button once to continue when finished The display should now show H 20 as shown in picture below This indicates the Hardness is 20 grains Use the UP or DOWN button to change this valu...

Страница 11: ...finished The display should now show DO 14 as shown in the picture below This indicates the Day Override is 14 days the system will regenerate on the 14TH day if the meter does not otherwise automatic...

Страница 12: ...Extra Cycle Button once to continue The display should now show BD 60 as shown in picture below This indicates Brine Draw Time is 60 minutes Do not change this value and press the Extra Cycle Button o...

Страница 13: ...may now show FM t0 7 as shown in picture below This indicates Flow Meter type 3 4 Turbine Do not change this value and press the Extra Cycle Button once to continue if this value is different use the...

Страница 14: ...n if applicable and turn cold water on slowly this will bleed the air from the tank let the water run until it clears If you sized your water softener using our recommendation then you will go through...