Model Q12
Installation, Operation and Maintenance
Page 4
Rev. 02/01/15
Q12-IOM-Q.
doc
R
ECEIVING
The shipment should be thoroughly inspected as
soon as it is received. The signed bill of lading is
acknowledgement by the carrier of receipt in
good condition of shipment covered by our
invoice.
If any of the goods called for on this bill of lading
are shorted or damaged, do not accept them until
the carrier makes a notation on the freight bill of
the shorted or damaged goods. Do this for your
own protection.
NOTIFY
Quality Lifts
AT ONCE if any hidden
loss or damage is discovered after receipt.
IT IS DIFFICULT TO COLLECT FOR LOSS OR
DAMAGE AFTER YOU HAVE GIVEN THE
CARRIER A CLEAR RECEIPT.
File your claim with
Q
uality Lifts
promptly.
Support your claim with copies of the bill of
lading, freight bill, and photographs, if available.
Component Packing List
PART #
QTY/ LIFT
DESCRIPTION
JSJ6-02-00
1
Power Column
Assembly
JSJ6-02-00f
1
Idler Column
Assembly
JSJ6-03-00
1
Overhead Assembly
Q12-HW-A
1
Hardware Box
JSJ6-02-02-00
1
Power Column
Extension
JSJ6-02-02-00f
1
Idler Column
Extension
JSJ6-09-00
4
Arm Assemblies
JSJ6-04-00
2
Synchronizer Cable
Assembly
Q12-HP
1
Hydraulic Hose
Pack
JSJ5-02-14A
2
Lock Cover
I
NSTALLATION
I
MPORTANT
:
Always wear safety glasses while installing lift.
T
OOLS
(
MINIMUM REQUIRED
)
a. Tape measure, 16ft
b. Chalk line
c. 4ft level
d. 10” adjustable wrench
e. Metric open end wrenches 10mm, 13mm,
14mm, 15mm, 17mm, 18mm, 19mm and
24mm
f.
Metric Allen Wrenches 4mm, 5mm, 6mm,
and 8mm.
g. Needle Nose pliers
h. Snap Ring pliers
i.
Hammer drill with 3/4” diameter carbide
tipped bits
j.
2lb hammer
k. Torque wrench: 150 foot pounds minimum
with 1 1/8” socket
l.
12 ft. Step ladder
m. Anti-Seize lubricant (for arm pins and foot
pad screw threads and stop rings)
L
AYOUT
1) Layout the service bay according to the
architect’s plans or owners instructions
(see
Fig 1b
).
Failure to install in this
orientation can result in personal and
property damage.
Be certain that the
proper conditions exist, see page 3.
2) Assemble column extension to column using
M12 x 30 Hex bolts. Repeat for opposite
column and extension. Install power column
extension on power column. NOTE: install
with nut and washer on the exterior of the
column.
3) Using the Overall Width (C) Dimension from
Fig 1
, chalk two parallel lines on the floor
within 1/8” tolerance. Erect both column
assemblies. Align the base plate edges to the
chalk lines.
Fig 1 –
Column Layout
Содержание Q12
Страница 13: ...Model Q12 Installation Operation and Maintenance Page 13 Rev 02 01 15 Q12 IOM Q doc BLANK PAGE...
Страница 15: ...Model Q12 Installation Operation and Maintenance Page 15 Rev 02 01 15 Q12 IOM Q doc BLANK PAGE...
Страница 21: ...Model Q12 Installation Operation and Maintenance Page 21 Rev 02 01 15 Q12 IOM Q doc NOTES...