background image

Model Q12 

Installation, Operation and Maintenance 

 

Page 2 

 

Rev. 02/01/15

 

 

 

Q12-IOM-Q.

doc 

G

ENERAL 

S

PECIFICATIONS

 

* Lift capacity ratings are based on loads equally distributed on all four arms. 
** Lifting and lowering speeds may vary depending on the weight of the vehicle. 

 
 

 

 

Fig 1a - General Specifications 

Fig1b - Service Bay Lay

out

 

 

 

 

See Figure 1 

Q12 

Q12 w/ 2 Ft. Ext. Kit 

A

    Rise Height (Screw Pads Highest Position)

 

77 3/4"

 

(1975 mm)

 

B

    Overall Height

 

13’-10"/14’-7”

 

(4216 mm/4445 mm)

 

15’-10"/16’-7”

 

(4826mm/ 5055mm)

 

C

    Overall Width

 

139 3/4"

 

(3550 mm)

 

D

    Drive-Thru Clearance

 

103"

 

(2616 mm)

 

E

    Floor to Overhead Switch

 

13’-3 ½"/14’-½”

 

(4051mm/4280 mm)

 

15’-3 ½"/16’-½”

 

(4661mm /4890mm)

 

F

    Minimum Arm Reach

 

35 3/4"

 

(910 mm)

 

G

    Maximum Arm Reach

 

54 1/2"

 

(1386 mm)

 

H

    Screw Pad Height

 

5 1/4"/ 6 3/4"

 

(133mm/171mm)

 

K

    Inside of Columns

 

115"

 

(2921 mm)

 

Lifting Capacity * 

(Hydraulic Pressure at Cap.) 

12,000 lbs. 

(2600 psi) 

Ceiling Height Required 

167"/176”

 

(4242mm/4470mm)

 

191"/200”

 

(4852mm/ 4890mm)

 

Motor 

2HP, Single Phase, 60Hz 

Voltage 

208-230 

Speed of Rise ** 

66 seconds 

Max Load Per Arm 

3000 lbs

 

(1360 kg)

 

Содержание Q12

Страница 1: ...MODEL Q12 12 000 LBS CAPACITY 3000 LBS PER ARM 200 Cabel Street P O Box 3944 Louisville Kentucky 40206 Email sales qualitylifts com Web site www qualitylifts com Office 877 771 5438 502 583 5438 Fax 5...

Страница 2: ...4 1975 mm B Overall Height 13 10 14 7 4216 mm 4445 mm 15 10 16 7 4826mm 5055mm C Overall Width 139 3 4 3550 mm D Drive Thru Clearance 103 2616 mm E Floor to Overhead Switch 13 3 14 4051mm 4280 mm 15...

Страница 3: ...installation Failure by purchaser to provide the recommended mounting surface could result in unsatisfactory lift performance property damage or personal injury LOCATION This lift has been evaluated f...

Страница 4: ...mblies JSJ6 04 00 2 Synchronizer Cable Assembly Q12 HP 1 Hydraulic Hose Pack JSJ5 02 14A 2 Lock Cover INSTALLATION IMPORTANT Always wear safety glasses while installing lift TOOLS MINIMUM REQUIRED a T...

Страница 5: ...if necessary Torque to 150 foot pounds to set anchors OVERHEAD 11 Raise and install Overhead Assembly using M12 x 30 Hex Bolts 12 Install Overhead Limit Switch under the Overhead Assembly on the Powe...

Страница 6: ...See Fig 7 Fig 7 Hose Routing Power Side 25 Route the remaining Power column hose beginning at the elbow fitting at the base up the backside of the column Join the three hoses with the supplied union t...

Страница 7: ...the entrapped air to escape Repeat for power side 42 Raise lift 6 inches Repeat step 41 until no air comes out of cylinder 43 Pressure test hydraulic system Energize power unit raise lift to full ris...

Страница 8: ...the lift to the owner operator and review correct and safe lifting procedures using the Lifting It Right booklet as a guide 54 Complete the Installation Checklist Warranty Validation questionnaire wit...

Страница 9: ...Model Q12 Installation Operation and Maintenance Page 9 Rev 02 01 15 Q12 IOM Q doc Normally Open FIELD CONECTIONS Fig 10 Electrical Wiring Diagram...

Страница 10: ...the lift inspectors are qualified and that they are adequately trained in the inspection of the lift The Owner Employer shall establish procedures to periodically maintain the lift in accordance with...

Страница 11: ...ontact the vehicle simultaneously The vehicle should remain level during lifting 4 Raise the lift until all four wheels are off the ground Test the stability of the vehicle by attempting to rock the v...

Страница 12: ...e until spring lock washer is fully compressed Check adapters for damage or excessive wear Replace as required with genuine Challenger Lifts parts Check lock release activation When properly adjusted...

Страница 13: ...Model Q12 Installation Operation and Maintenance Page 13 Rev 02 01 15 Q12 IOM Q doc BLANK PAGE...

Страница 14: ...______ CITY _______________ STATE _____ ZIP ________ CUSTOMER INFORMATION COMPANY NAME ________________________ CONTACT _______________________ PHONE NUMBER ________________ ADDRESS __________________...

Страница 15: ...Model Q12 Installation Operation and Maintenance Page 15 Rev 02 01 15 Q12 IOM Q doc BLANK PAGE...

Страница 16: ...CABLE TRAPPING ROD 8 X10 034 10 M6 NUT 9 JSJ4 02 18 2 HOSE GUIDE NUT 10 JSJ4 02 17 2 HOSE GUIDE 11 JSJ4 02 08 2 LOCK RELEASE SHEAVE PIN M6 12 JSJ4 02 09 2 LOCK RELEASE SHEAVE 13 X10 032 6 M6 WASHER 14...

Страница 17: ...SE SHEAVE PIN M6 41 JSJ4 02 09 2 LOCK RELEASE SHEAVE 42 X10 032 2 M6 WASHER 43 X10 034 2 M6 NUT 44 JSJ5 02 06 1 LOCK RELEASE HANDLE SHAFT 45 X10 017 1 LOCK RELEASE KNOB 46 X10 037 24 M12 x 30mm BOLT 4...

Страница 18: ...18 1 5 8 18 UN HOSE 411 LONG 59 JSJ6 15 1 9 16 18 UN x 9 16 18 UN x 5 8 18 UN TEE FITTING 60 JSJ5 17 1 9 16 18 UN POWER UNIT HOSE 61 JSJ4 16 1 9 16 18 UN POWER CYLINDER HOSE 62 JSJ6 19 1 9 16 18 UN 90...

Страница 19: ...TTER PIN 72 JSJ6 03 08 6 CABLE SHEAVE 73 X10 055 4 26mm WASHER 74 JSJ6 03 03 2 CABLE SHEAVE PIN 75 JSJ6 03 05 2 SHEAVE SPACER 76 X10 038 2 M12 WASHER 77 X10 039 2 M12 LOCK WASHER 78 X10 053 2 M12 x 45...

Страница 20: ...EAR 97 JSJ6 09 01 00 4 FEMALE ARM WELD 98 JSJ6 09 02 00 4 MALE ARM WELD 99 JSJ4 09 08 4 M10 x 14 STOP BOLT DOG POINT 100 X10 073 4 M10 WASHER 101 B2211 4 M6 ROLL PIN 102 B12062S 12 4 FOOT PAD ASSEMBLY...

Страница 21: ...Model Q12 Installation Operation and Maintenance Page 21 Rev 02 01 15 Q12 IOM Q doc NOTES...

Отзывы: