Model EQ10
Installation, Operation and Maintenance
Page 6
Rev. 11/30/2020
EQ
10-IOM-Q.
doc
Fig. 6 – Synchronizing Cables
P
OWER
U
NIT
&
H
YDRAULIC
L
INES
19) Mount Power Unit to power column as shown in
Fig 7
using (4) M8 hex bolts and nuts.
20) Attach hydraulic elbow fitting threading the O-
Ring end into the power unit.
21)
IMPORTANT – To ensure proper hose fitting
seal without damage to the fitting follow this
procedure for each hose connection:
Screw
flared fitting on finger tight. Rotate flared fitting 1
½ flats or 90 degrees. Back the flared fitting off
one full turn and repeat.
22) Thread power unit hose (short) to elbow on
power unit.
Fig. 7 – Hose Routing
23) Beginning on the idler side, attach the idler
hose to the cylinder elbow fitting. Route the
idler hose (long) up the backside of the column
and thru the plastic guide at the top of the
extension. Continue across the overhead
through each of the guides as shown in
Fig 8
and down the backside of the power column.
24) Route the power hose from the cylinder elbow
fitting to the union tee provided. Connect idler
hose and power unit hose to union tee as
shown in
Fig 7
.
25) Use hose clamps and M8 Screws to secure
hydraulic hoses as shown in
Figure 7
.
26)
B
E
C
ERTAIN
A
LL
F
ITTINGS AND
C
ONNECTIONS
ARE
T
IGHT
.
I
T IS THE INSTALLERS RESPONSIBILITY
TO
E
NSURE SYSTEM IS LEAK
-
FREE
.
Fill the Power
Unit with three gallons of clean 10wt anti-foam
anti-rust hydraulic oil or Dexron
III
ATF.
D
O
N
OT
U
SE
O
ILS
W
ITH
D
ETERGENTS
.
C
OLUMN
E
XTENSIONS
27) Use hardware shown in
Fig 8
to install bolt-on
hose guide components.
Fig. 8 – Column Extensions
L
OCK
R
ELEASE
28) Install Lock Release Rod, Clevis, and Knob to
the Power Column Lock using one M10 Nut.