background image

Model EQ10 

Installation, Operation and Maintenance 

 

                   Page 6 

  

Rev. 11/30/2020

 

  

EQ

10-IOM-Q.

doc 

 

Fig. 6 – Synchronizing Cables 

P

OWER 

U

NIT 

&

 

H

YDRAULIC 

L

INES

 

 

19) Mount Power Unit to power column as shown in 

Fig 7 

using (4) M8 hex bolts and nuts.  

20) Attach hydraulic elbow fitting threading the O-

Ring end into the power unit.  

21) 

IMPORTANT – To ensure proper hose fitting 
seal without damage to the fitting follow this 
procedure for each hose connection:

    Screw 

flared fitting on finger tight. Rotate flared fitting 1 
½ flats or 90 degrees.  Back the flared fitting off 
one full turn and repeat. 

22) Thread power unit hose (short) to elbow on 

power unit. 

 

Fig. 7 – Hose Routing 

 

23)  Beginning on the idler side, attach the idler 

hose to the cylinder elbow fitting.  Route the 
idler hose (long) up the backside of the column 
and thru the plastic guide at the top of the 
extension. Continue across the overhead 
through each of the guides as shown in 

Fig 8

 

and down the backside of the power column.   

24) Route the power hose from the cylinder elbow 

fitting to the union tee provided. Connect idler 
hose and power unit hose to union tee as 
shown in 

Fig 7

.

 

25) Use hose clamps and M8 Screws to secure 

hydraulic hoses as shown in 

Figure 7

.

 

26) 

B

C

ERTAIN 

A

LL 

F

ITTINGS AND 

C

ONNECTIONS 

ARE 

T

IGHT

I

T IS THE INSTALLERS RESPONSIBILITY 

TO 

E

NSURE SYSTEM IS LEAK

-

FREE

Fill the Power 

Unit with three gallons of clean 10wt anti-foam 
anti-rust hydraulic oil or Dexron 

III 

ATF. 

D

N

OT 

U

SE 

O

ILS 

W

ITH 

D

ETERGENTS

.

 

C

OLUMN 

E

XTENSIONS

 

27) Use hardware shown in 

Fig 8

 to install bolt-on 

hose guide components. 

 Fig. 8 – Column Extensions  

L

OCK 

R

ELEASE

 

28) Install Lock Release Rod, Clevis, and Knob to 

the Power Column Lock using one M10 Nut. 

Содержание EQ10

Страница 1: ...Post Surface Mounted Lift MODEL EQ10 QUALITY LIFTS LLC 2311 South Park Rd Louisville KY 40219 TOLL FREE 877 771 5438 FAX 502 583 5488 E mail sales qualitylifts com www qualitylifts com IMPORTANT READ...

Страница 2: ...1 4 1899 mm 75 1 4 1975 mm with Adapter B Overall Height 143 7 8 3655 mm C Overall Width 131 3 4 3347 mm D Drive Thru Clearance 98 3 8 2499 mm E Floor to Overhead Switch 137 3482 mm F Short Arm Reach...

Страница 3: ...ulted to address seismic loads and other local or state requirements Failure by purchaser to provide the recommended mounting surface could result in unsatisfactory lift performance property damage or...

Страница 4: ...not provided with the lift shipment 10 wt anti foam anti rust hydraulic biodegradable oil Dexron III ATF INSTALLATION SAFETY REQUIREMENTS FOR INSTALLATION AND SERVICE Refer to ANSI ALI ALIS current ed...

Страница 5: ...Fig 3 Column Shimming 10 Tighten power column anchors and recheck column for plumb Re shim if necessary Torque to 150 foot pounds to set anchors OVERHEAD LIMIT SWITCH 11 Raise and install Overhead Ass...

Страница 6: ...e the idler hose long up the backside of the column and thru the plastic guide at the top of the extension Continue across the overhead through each of the guides as shown in Fig 8 and down the backsi...

Страница 7: ...and apply anti seize to the three retaining rings and where the double screw makes contact with the base of the footpad 34 Ensure arm stop hardware is present and adequately tightened so that spring...

Страница 8: ...ise If lubricant is not wiped clean from the cylinder rod the cylinder will apear to be leaking SYNCHRONIZING CABLES 50 Raise lift and ensure carriages lower into same lock position 51 Adjust synchron...

Страница 9: ...1 2 3 4 5 6 L3 L2 L1 T3 T2 T1 FACTORY WIRED FOR 208 240V 6 4 2 5 3 1 RECONNECTIONS FOR 440 480V T3 T2 T1 T9 T6 T7 T4 T8 T5 FOR THREE PHASE M FOR SINGLE PHASE Wiring Diagram 1 L1 3 L2 5 L3 2 T1 4 T2 6...

Страница 10: ...the lift inspectors are qualified and that they are adequately trained in the inspection of the lift The Owner Employer shall establish procedures to periodically maintain the lift in accordance with...

Страница 11: ...vehicle by attempting to rock the vehicle Check adapters for secure contact with vehicle lift points If the vehicle seems unstable lower the lift and readjust the arms If the vehicle is stable raise t...

Страница 12: ...d leaks Check adapters for damage or excessive wear Replace as required with genuine Challenger Lifts parts Check lock release activation When properly adjusted the idler column lock should rest firml...

Страница 13: ...Model EQ10 Installation Operation and Maintenance Page 13 Rev 11 30 2020 EQ10 IOM Q doc Parts Breakdown...

Страница 14: ...Model EQ10 Installation Operation and Maintenance Page 14 Rev 11 30 2020 EQ10 IOM Q doc...

Страница 15: ...ex Nut 13 AB 9367 DLH 1 Power Unit 58 B2065 5 1 M10 x 55 Clevis Pin 13 14 AD 9367 1 1 Power Unit 3Phase 59 GJY12 3 7 Hairpin Cotter Pin JSJ5 03 02CH Shutoff Bar 60 X10 095 8 Nut M16 15 JSJ5 03 03 1 Sh...

Страница 16: ...Q10 Installation Operation and Maintenance Page 16 Rev 11 30 2020 EQ10 IOM Q doc REVISIONS 11 30 2020 ADDED STEP TO CHECK THE ARM STOP BOLTS TO MAKE SURE THEY ARE TIGHT UPDATED LOCK RELEASE CABLE PART...

Отзывы: