Model EQ10 

Installation, Operation and Maintenance 

 

                   Page 5 

  

Rev. 11/30/2020

 

  

EQ

10-IOM-Q.

doc 

A

NCHORING

 

4)  The anchor bolts must be installed at least 8” 

from any crack, edge, or expansion joint. 

5)  Use a concrete hammer drill with a 3/4-inch 

carbide bit. Tip diameter should conform to ANSI 
Standard B94.12-1977 (.775 to .787). Do not use 
excessively worn bits or bits which have been 
incorrectly sharpened. A core bit may be 
necessary if an obstruction is encountered. 

Never substitute with shorter anchor. 

6)  Recheck “Inside of Columns” dimension, 

Fig 1

Drill the anchor holes using the base plate as a 
template. Drill through the floor if possible or to a 
depth of 5 inches minimum. 

7)  Vacuum dust from the hole for proper holding 

power. 

8)  Shim both columns to plumb using the shims 

provided as shown in 

Fig 2

. DO NOT shim more 

than 1/2" at any given point. Use a level no less 
than 24” in length to plumb columns. 

9)  Assemble washer and nut to anchor with nut just 

below impact section of bolt. Drive anchor into 
hole until nut and washer contact base. 

 

 

Fig. 3 – 

Column Shimming

 

10) Tighten power column anchors and recheck 

column for plumb. Re-shim if necessary. Torque 
to 150 foot-pounds to set anchors. 

O

VERHEAD

/L

IMIT 

S

WITCH

 

11) Raise and install Overhead Assembly using M12 

x 30 Hex Bolts.

 

12) Install Overhead Limit Switch and Shutoff Bar 

under the Overhead Beam as shown in

 Fig 4.

 

13) Check idler column shimming. Use additional 

shims (

see Fig 3

) to remove any gaps that may 

have been created while installing overhead 
beam. Tighten anchor bolts and re-check column 
for plumb. Torque to 150 foot-pounds.

 

 

Fig. 4 - Limit Switch 

 

S

YNCHRONIZER 

C

ABLES

 

14) Manually raise each carriage into the second 

lock position. 

15) 

At the upper beam sheave locations 
disassemble and reassemble the cable trapping 
rod to install the cable onto the sheave as shown 
in 

Fig 5

.  At base of columns, bottom sheave will 

need to be removed then reassembled. 

 

Fig. 5-Cable Trapping 

16) Attach one end of synchronizing cable to 

carriage. See 

Fig 6

 for proper attachment. 

17) Route cable up and over sheave in overhead. 

Follow across to other sheave on opposite 
column. Route down through carriage to sheave 
in bottom of column. Route under sheave and up 
to cable attachment. Use 

Fig 6

 for proper 

attachment.  

18) Repeat for opposite side. 

Содержание EQ10

Страница 1: ...Post Surface Mounted Lift MODEL EQ10 QUALITY LIFTS LLC 2311 South Park Rd Louisville KY 40219 TOLL FREE 877 771 5438 FAX 502 583 5488 E mail sales qualitylifts com www qualitylifts com IMPORTANT READ...

Страница 2: ...1 4 1899 mm 75 1 4 1975 mm with Adapter B Overall Height 143 7 8 3655 mm C Overall Width 131 3 4 3347 mm D Drive Thru Clearance 98 3 8 2499 mm E Floor to Overhead Switch 137 3482 mm F Short Arm Reach...

Страница 3: ...ulted to address seismic loads and other local or state requirements Failure by purchaser to provide the recommended mounting surface could result in unsatisfactory lift performance property damage or...

Страница 4: ...not provided with the lift shipment 10 wt anti foam anti rust hydraulic biodegradable oil Dexron III ATF INSTALLATION SAFETY REQUIREMENTS FOR INSTALLATION AND SERVICE Refer to ANSI ALI ALIS current ed...

Страница 5: ...Fig 3 Column Shimming 10 Tighten power column anchors and recheck column for plumb Re shim if necessary Torque to 150 foot pounds to set anchors OVERHEAD LIMIT SWITCH 11 Raise and install Overhead Ass...

Страница 6: ...e the idler hose long up the backside of the column and thru the plastic guide at the top of the extension Continue across the overhead through each of the guides as shown in Fig 8 and down the backsi...

Страница 7: ...and apply anti seize to the three retaining rings and where the double screw makes contact with the base of the footpad 34 Ensure arm stop hardware is present and adequately tightened so that spring...

Страница 8: ...ise If lubricant is not wiped clean from the cylinder rod the cylinder will apear to be leaking SYNCHRONIZING CABLES 50 Raise lift and ensure carriages lower into same lock position 51 Adjust synchron...

Страница 9: ...1 2 3 4 5 6 L3 L2 L1 T3 T2 T1 FACTORY WIRED FOR 208 240V 6 4 2 5 3 1 RECONNECTIONS FOR 440 480V T3 T2 T1 T9 T6 T7 T4 T8 T5 FOR THREE PHASE M FOR SINGLE PHASE Wiring Diagram 1 L1 3 L2 5 L3 2 T1 4 T2 6...

Страница 10: ...the lift inspectors are qualified and that they are adequately trained in the inspection of the lift The Owner Employer shall establish procedures to periodically maintain the lift in accordance with...

Страница 11: ...vehicle by attempting to rock the vehicle Check adapters for secure contact with vehicle lift points If the vehicle seems unstable lower the lift and readjust the arms If the vehicle is stable raise t...

Страница 12: ...d leaks Check adapters for damage or excessive wear Replace as required with genuine Challenger Lifts parts Check lock release activation When properly adjusted the idler column lock should rest firml...

Страница 13: ...Model EQ10 Installation Operation and Maintenance Page 13 Rev 11 30 2020 EQ10 IOM Q doc Parts Breakdown...

Страница 14: ...Model EQ10 Installation Operation and Maintenance Page 14 Rev 11 30 2020 EQ10 IOM Q doc...

Страница 15: ...ex Nut 13 AB 9367 DLH 1 Power Unit 58 B2065 5 1 M10 x 55 Clevis Pin 13 14 AD 9367 1 1 Power Unit 3Phase 59 GJY12 3 7 Hairpin Cotter Pin JSJ5 03 02CH Shutoff Bar 60 X10 095 8 Nut M16 15 JSJ5 03 03 1 Sh...

Страница 16: ...Q10 Installation Operation and Maintenance Page 16 Rev 11 30 2020 EQ10 IOM Q doc REVISIONS 11 30 2020 ADDED STEP TO CHECK THE ARM STOP BOLTS TO MAKE SURE THEY ARE TIGHT UPDATED LOCK RELEASE CABLE PART...

Отзывы: