5
A S S E M B LY I N S T R U C T I O N S
PARTS LIST:
Fireplace
1
A)
Mounting bracket
1
B)
Mounting screws
3
C)
Wall anchors
3
D)
Washers
3
E)
Plastic pads
3
TOOLS REQUIRED: Level, electric drill, drill bits
5/16 in (8 mm), Phillips screwdriver, hammer,
safety goggles and gloves.
CAUTION: The fireplace unit should not be posi-
tioned in an area exposed to direct sunlight.
INSTALLATION:
Step 1: Select the wall location where you
want to hang your electric fireplace. Measure
the area where the mounting bracket will be
installed. Using the level, draw a guide line.
Mark on the line where you will drill your holes
for the mounting screws. Use the guide line as
the center line to ensure your fireplace will be
mounted straight and level. See Fig. A.
fig. A
Step 2: Drill 3 holes (5/16 in (8 mm) on the
marked locations. For holes that do not hit
studs, use the supplied WALL ANCHORS (C).
Install the WALL ANCHORS into the holes and
gently tap them into place with a hammer, until
the flange of the wall anchor is flush with the
wall surface. See Fig. B.
fig. B
Step 3: Secure the MOUNTING BRACKET (A)
to the wall with 3 MOUNTING SCREWS (B) and
WASHERS (D). See Fig. C.
fig. C
Step 4: Remove the paper backing of plastic
pads [E]. Affix 3 Plastic pads at the back of
fireplace as shown in Fig. D.
fig. D
Step 5: Mount the fireplace to the MOUNTING
BRACKET. The extruded flange on the back of
the fireplace should be fully inserted into the
MOUNTING BRACKET. See Fig. E
Содержание W913T-33BK
Страница 10: ...12...