Installation of the front mounting tube and rotation plate
Measure to determine the position of the blade
Step.3
Measure the distance from the hook mount to the front of
the ATV then add 7 inches, keep this measure for step 5.
Note: For models equipped with tracks, measure the
distance between the hook mount and the end of the track
and then add 4 inches.
A
G
G
C
D
C
D
F
E
F
E
B
H
H
13
Step.4
Insert the front mounting tube and rotation plate assembly (A) between the two
posts (B) of the snow blade.
Align the holes in the rotation plate with the holes of the two posts of the snow
blade then secure in place using shoulder bolts (C) and large washers (D) and
from inside the rotation plate use washers (E) and nuts (F).
Install the two springs (G) by inserting one end into the eye bolt
and the other in the hole of the rotation plate.
Adjust the spring tension using eye bolts (H).
Chenille
Track
Distance from the hook mount to the front of the ATV then add 7’’
Distance from the hook mount to the end of the track then add 4’’
ASSEMBLY