Quadra-Fire XPLRMED-PBK Скачать руководство пользователя страница 6

 6 

 

 

 

 

                        7061-197H 

 

 

 

       November 10, 2015

Explorer II Medium Wood Stove

ATTENTION INSTALLER:

Follow this Standard Work Checklist

This standard work checklist is to be used by the installer in conjunction with, not instead of, the instructions contained in this installation manual.

 

Customer: 

 

     

 Date Installed: 
 Lot/Address:
 Location of Fireplace:

 Installer

.Dealer/.Distributor.Phone.#:

.Serial.#:.

 Model (circle one):    

EXPLRMED-PBK      EXPLRMED-PDB      EXPLRMED-PFT      EXPLRMED-PMH      EXPLRMED-MBK

WARNING! Risk of Fire or Explosion! 

Failure to install fireplace according to these instructions can lead to a fire or explosion.

Appliance Install                                                                                              

Verified clearances to combustibles. (Pg. 8)

Hearth extension size/height decided. (Pg. 14) 

Outside air kit installed. (Pg. 15)

Floor protection requirements have been met.

If appliance is connected to a masonry chimney, it should be cleaned and 

inspected by a professional. If installed to a factory built metal chimney, the 

chimney must be installed according to the manufacturer’s instructions and 

clearances. 

Chimney

.Section.4.(Pg..11)

Chimney configuration complies with diagrams.

Chimney installed, locked and secured in place with proper clearance. 

Chimney meets recommended height requirements (14-16 feet).

Roof flashing installed and sealed.

Terminations installed and sealed.

Clearances

.Section.3.(Pg..7)

Combustible materials not installed in non-combustible areas.

Verified all clearances meet installation manual requirements.

Mantels and wall projections comply with installation manual requirements. 
Protective hearth strips and hearth extension installed per manual requirements.

Appliance Setup

.Section.5.(Pg..14)

All packaging and protective materials removed. 

Firebrick, baffle and ceramic blanket installed correctly. 

All labels have been removed from the door.

All packaging materials are removed from inside/under the fireplace.

Manual bag and all of its contents are removed from inside/under the fireplace

     and given to the party responsible for use and operation.

Hearth.&.Home.Technologies.recommends.the.following:

• Photographing the installation and copying this checklist for your file.
• That this checklist remain visible at all times on the fireplace until the installation is complete.

Comments: 

Further description of the issues, who is responsible (Installer/Builder/Other Trades, etc.) and corrective action needed:

Comments communicated to party responsible                                                         by                                             on                    
  

 

 

 

          

(Builder/Gen. Contractor)                           (Installer)                        (Date)

Part # 4017-254 • Rev B • 01/29/13

YES...... IF.NO,.WHY?

F..

Install Checklist

Содержание XPLRMED-PBK

Страница 1: ...sonnel Hearth Home Technologies recommends NFI certified professionals or technicians supervised by an NFI certified professional HOT SURFACES Glass and other surfaces are hot during operation AND coo...

Страница 2: ...Canada NOT APPROVED FOR MOBILE HOME INSTALLATIONS IN CANADA 1 Important Safety Information 3 A Appliance Certification 3 B BTU Efficiency Specifications 3 C Mobile Home Approved USA ONLY 3 D Glass Spe...

Страница 3: ...tained The appliance must be properly grounded to the frame of the mobile home with 8 copper ground wire and chimney must be listed to UL103 HT or a listed UL 1777 full length six inch 152mm diameter...

Страница 4: ...with unit Do NOT Overfire If appliance or chimney connector glows you are overfiring Any such action that may cause a fire hazard WARNING Fire Risk Hearth Home Technologies disclaims any responsibilit...

Страница 5: ...ipped or sealed Attic mounted duct work and air handler joints and seams taped or sealed Basement installations should be avoided WARNING Negative pressure can cause spillage of com bustion fumes soot...

Страница 6: ...earance Chimney meets recommended height requirements 14 16 feet Roof flashing installed and sealed Terminations installed and sealed Clearances Section 3 Pg 7 Combustible materials not installed in n...

Страница 7: ...19 1 2 26 3 4 Figure 7 1 Front View Figure 7 2 Side View 12 1 4 20 1 16 7 15 16 27 28 15 16 Figure 7 2 Top View 29 3 25 7 8 22 3 16 Figure 7 4 Side View with horizontal fl ue 3 Dimensions and Clearanc...

Страница 8: ...1397 Explorer II 10 1 2 267 6 1 2 165 20 1 4 514 6 1 2 165 7 178 17 1 4 438 55 1397 MINIMUM CLEARANCES TO COMBUSTIBLE MATERIALS in inches Millimeters NOTE A C and F Dimensions are to the center of th...

Страница 9: ...mney should Install through the warm space enclosed by the build ing envelope This helps to produce more draft espe cially during lighting and die down of the fire Penetrate the highest part of the ro...

Страница 10: ...Minimum 3 ft 91cm Minimum Wall or Parapet Flat Roof E 2 10 3 Rule These are safety requirements and are not meant to assure proper flue draft This appliance is made with a 6 inch 152mm diameter chimn...

Страница 11: ...l black or 26 gauge blued steel or an approved air insulated double wall venting pipe Thimble A manufactured or site constructed device installed in combustible walls through which the chimney connect...

Страница 12: ...utside dimension frame from 2 x 2 framing lumber to fit into wall opening Inside opening of frame should be no less than 14 inch x 14 inch 356mm x 356mm Figure 12 1 4 Attach the wall spacer to the chi...

Страница 13: ...ctors must conform to each other to ensure a proper fit and seal Flue Gas Direction Crimped End Toward Appliance Secure pipe sections with a minimum of 3 screws Figure 13 2 Chimney Connector Stove Pip...

Страница 14: ...ary to install a floor protector Type I of a minimum of 3 8 inch 9 5mm thick metal clad millboard or equivalent a minimum of 16 inches 406mm in front of glass and 8 inches 203mm to both sides of the f...

Страница 15: ...a 2 Phillips screw driver attach the flex adapter to the stove using 4 screws Figure 15 1 15 2 3 Floor Rear Installation Cut a 4 inch 102mm hole in outside wall or floor to accommodate outside air pip...

Страница 16: ...lts securing blower onto outer wall of appliance 4 Place the bracket containing the snap disc and magnet under the bottom left rear corner See Owner s Manual for detailed operating instructions for th...

Страница 17: ...lips and convection chamber top 2 Phillips 2 Remove 1 bolt from each side of the flue transition and retrieve nuts attached to bolts 3 Turn flue transition to horizontal position Inspect rope gasketin...

Страница 18: ...a 6 inch 152mm factory built chimney conforming to CAN ULC 629M STANDARD FOR FACTORY BUILT CHIMNEYS 6 Follow the chimney and chimney connector manufacturer s instructions when installing the flue syst...

Страница 19: ...REPAIR Y Nut Ser Flange Small 1 4 20 Pkg of 24 226 0130 24 Y Screw Pan Head Philips 8 32 X 3 8 Pkg of 40 225 0500 40 Y Screw Sheet Metal 8 X 1 2 S Grip Pkg of 40 12460 40 Y Washer 1 4 Sae Pkg of 24 2...

Страница 20: ...eration DO NOT DISCARD Please contact your Quadra Fire dealer with any questions or concerns For the number of your nearest Quadra Fire dealer log onto www quadrafire com CONTACT INFORMATION This prod...