background image

September 1, 2008

Page  39

Quadra-Fire · Topaz · 7009-113G

D.  After Appliance is Lit

When you light your appliance, you may notice that it pro-
duces heat which does have an associated odor or smell. If 
you feel this odor is excessive it may require the initial three 
to four hour continuous burn on high followed by a second 
burn up to 12 hours to fully drive off any odor from paint and 
lubricants used in the manufacturing process. Condensation 
on the glass is normal.

NOTE: 

 The appliance should be run three to four hours 

on the initial start-up. Turn it off and let it cool completely. 
Remove and clean the glass. Replace the glass and run the 
appliance for an additional 12 hours. This will help to cure 
the products used in the paint and logs.

During this break-in period it is recommended that some 
windows in the house be opened for air circulation. This will 
help avoid setting off smoke detectors, and help eliminate 
any odors associated with the appliance’s initial burning.

Initial Break-in Procedure

E.  Frequently Asked Questions

Fire Hazard.
Keep combustible materials, gasoline 
and other flammable vapors and liquids 
clear of appliance.

WARNING

•  Do NOT store flammable materials in the appliance’s 

vicinity.

•  Do NOT use gasoline, lantern fuel, kerosene, charcoal 

lighter  fluid or similar liquids in this appliance.

•  Combustible materials may ignite.

Smoke and odors released during initial operation.

•  Open windows for air circulation.
•  Leave room during initial operation.
•  Smoke may set off smoke detectors.

Smoke and odors may be irritating to sensitive individuals.

CAUTION

•  Prevent accidental appliance operation when not 

attended. 

•  Unplug or remove batteries from remote control if absent 

or if appliance will not be used for an extended period of 
time.

•  Property damage possible from elevated temperatures.

CAUTION

ISSUE

SOLUTIONS

Condensation on the glass

This is a result of gas combustion and temperature variations. As the appliance warms, 
this condensation will disappear.

Blue flames

This is a result of normal operation and the flames will begin to yellow as the appliance 
is allowed to burn for 20 to 40 minutes.

Odor from appliance

When first operated, this appliance may release an odor for the first several hours. 
This is caused by the curing of the paint and the burning off of any oils remaining from 
manufacturing.  If appliance has not been used for some time, dust can build up and 
cause an odor.

Film on the glass

This is a normal result of the curing process of the paint and logs. Glass should be 
cleaned within 3 to 4 hours of initial burning to remove deposits left by oils from the 
manufacturing process. A non-abrasive cleaner such as gas appliance cleaner may be 
necessary. See your dealer. 

Metallic noise

Noise is caused by metal expanding and contracting as it heats up and cools down, 
similar to the sound produced by a furnace or heating duct. This noise does not affect 
the operation or longevity of the appliance.

Fire Risk.

High Temperatures.

WARNING

Keep combustible household items away from appliance.
Do NOT obstruct combustion and ventilation air.
•  Do NOT place combustible items on top of or in front of  

appliance. 

•  Keep furniture, draperies away from appliance.

Содержание TOPAZ Direct Vent Room Heater 839-1290

Страница 1: ...n may result causing property damage personal injury or death This appliance may be installed as an OEM installation in manufactured home USAonly or mobile home and must be installed in accordance wit...

Страница 2: ...par un technicien qualife et ou muni d une licence de mani re respecter les r glements municipaux Dans la R publique de Massachusetts l installation doit tre effectu e par un plombier ou un installat...

Страница 3: ...as Information A Fuel Conversions 23 B Gas Pressures 25 C Gas Connection 26 Section 7 Electrical Information A Recommendation for Wire 27 B Connecting to the Appliance 27 C Standing Pilot Ignition Sys...

Страница 4: ...ING Do NOT use this appliance if any part has been under water Immediately call a quali ed service technician to inspect the unit and to replace any part of the control system and any gas control whic...

Страница 5: ...ent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OB...

Страница 6: ...ive surface See page 34 Remove log set and component pack from rebox Report to your dealer any parts damaged in shipment particularly the condition of the glass Read all of the instructions before sta...

Страница 7: ...ll appliance to all clearance speci cations in manual WARNING B Clearances Figure 3 1 Model A B C D E F G Topaz Inches 6 1 2 6 1 54 36 40 23 Millimeters 165 152 25 1372 914 1016 584 NOTE Flooring bene...

Страница 8: ...aintain vent clearance to combustibles as speci ed WARNING Do not pack air space with insulation or other materials Failure to keep insulation or other materials away from vent pipe may cause re HORIZ...

Страница 9: ...MIN RMAX 1 cap 3 feet 2 x Q ACTUAL 2 caps 6 feet 1 x Q ACTUAL 3 caps 9 feet 2 3 x Q ACTUAL 4 caps 12 feet 1 2 x Q ACTUAL QMIN termination caps x 3 RMA X 2 termination caps xQACTUAL N 6 inches non viny...

Страница 10: ...NING Diagonal runs have both vertical and horizontal vent aspects when calculating the effects Use the rise for the vertical aspect and the run for the horizontal aspect See Figure 5 1 Two 45 elbows m...

Страница 11: ...is 20 ft 6m when the vertical vent rise is 10 ft 3m The minimum horizontal vent run is 6 in 152mm Horizontal sections require a 1 4 in 6mm rise for every 12 in 305mm of horizontal travel Exterior Vent...

Страница 12: ...et a twist lock adapter is built into the appliance at the factory Wall thickness may vary Remember to include wall thickness in minimum clearances when figuring venting lengths for your installation...

Страница 13: ...If the snorkel termination must be installed below grade i e basement application proper drainage must be provided to prevent water from entering the snorkel termination Do not backfill around snorke...

Страница 14: ...tal top to vinyl standoff SCREWS Apply sealant to all four sides VINYL SIDING Figure 5 8 8 in 203mm 7 in 178mm 7 in 178mm 6 in 152mm Figure 5 7 NOTE Some termination caps may cause the vent pipe to be...

Страница 15: ...bows Step 2 Set the gas appliance in its desired location Drop a plumb bob down from the ceiling to the position of the appliance flue exit and mark the location where the vent will penetrate the ceil...

Страница 16: ...code requirements as outlined in the current CAN CGA B149 Installation Codes in Canada the National Fuel Gas Code NFPA 54 ANSI Z223 1 in USA or local codes Note that for steep roof pitches the vent he...

Страница 17: ...be framed and sheetrocked with standard construction materials however refer to these installation instructions for the minimum allowable clearance between the outside of the vent pipe and the combus...

Страница 18: ...f sheathing Step 5 Using tin snips cut the support box from the top corners down to the roofline and fold the resulting flaps over the roof sheathing Figure 5 18 Before nailing it to the roof run a be...

Страница 19: ...n 76mm Connect the flex pipe to the retro connector and attach with sheet metal screws Step 6 Push the flex pipe back up into the ceiling support box center the retro connector and attach it to the su...

Страница 20: ...mm Flex Liner Pipe Length Optional Chimney Liner Termination Cap Co Axial to Co Linear Connector 30 ft 9m of 3 in 76mm Flex Liner Exhaust Section Pipe Length Optional 4 ft 1m of 3 in 76mm Flex Liner A...

Страница 21: ...this length extended to its nominal length Be sure to leave 2 3 in 51 76mm of flex above the existing chimney to allow for connection to the termination kit Step 3 Secure the flashing to the top of t...

Страница 22: ...Secure the top adapter to the flashing Use three sheet metal screws through the side of the top adapter into the flange on the flashing Figure 5 28 Twist lock the high wind termination cap on to the t...

Страница 23: ...urner by rst remov ing the two screws indicated and lifting the burner out Figure 6 3 Remove the three screws on the front of the burner support Set screws aside Figure 6 5 Remove the main burner ori...

Страница 24: ...and adapter cap Fire Risk Explosion Risk Disconnect any electrical cords and turn off gas supply to unit before proceeding if converting fuel on an appliance already fully installed WARNING Replace pi...

Страница 25: ...below Proper input pressures required for optimum appliance per formance gas line sizing requirements need to be followed from NFPA51 WARNING Fire Risk Explosion Hazard High pressure will damage valv...

Страница 26: ...th local building codes if any If not follow ANSI Z223 1 Instal lation should be done by a quali ed installer approved and or licensed as required by the locality In the Commonwealth of Massachusetts...

Страница 27: ...ermostat see individ ual thermostat instructions to ensure proper operation of appliance 4 Use low resistance thermostat wire for wiring from igni tion system to the wall switch and thermostat 5 Use t...

Страница 28: ...ng controls Wiring errors can cause improper and dangerous operation Verify proper operation after servicing Shock hazard Replace damaged wire with type 105O C rated wire Wire must have high temperatu...

Страница 29: ...adapter before installing as indicated in Figure 8 6 Figure 8 2 Remove inner collar adapter KIT CONTENTS Rear vent grille TOOLS REQUIRED Power drill 2 Phillips bit high temp silicone sealant optional...

Страница 30: ...Home Technologies approved accessories may be used safely WARNING C Leg Leveling System Figure 8 8 Thread Allen bolts through nuts until ush The Allen bolts and nuts are included in the component pac...

Страница 31: ...TRUCTIONS FOR QUARTET AND SOLITAIRE FACE OPTIONS Figure 8 11 Solitaire Front Quartet Front Spacer NOTE The brick supplied with the Topaz is not an optional accessory The brick must be installed for sa...

Страница 32: ...talled side panel and support the other end with one hand Install the remaining side panel and bend over the tabs to hold it in place Rest top panel baf e on sides and slide top panel baf e left or ri...

Страница 33: ...omplete your log set applica tion reinstall the glass and the front of the unit H Mineral Wool Follow ember placement instructions in manual Do NOT place embers directly over burner ports Replace embe...

Страница 34: ...ckaging Place blower under appliance Attach blower from front with 4 screws to blower bracket Figure 8 27 Install snap disc in bracket Attach bracket to re box with 5 16 in wrench Figure 8 28 Connect...

Страница 35: ...08 Page 35 Quadra Fire Topaz 7009 113G Figure 8 31 Blower Wiring Diagram Fan Speed Control Thermal Disc 110 VAC Power Cord BLAC K Bushing Strain Relief GREEN BLACK Ground Fan Assembly BLACK BLACK WHIT...

Страница 36: ...wingnut to lock in place K Damper Adjustment Make adjustment Let appliance warm up before adjusting Loosen screw using a Phillips head screwdriver Pivot the vertical damper adjustor in 1 4 in 6mm incr...

Страница 37: ...the baf e adjustment Ensure that there are no gas leaks Ensure that the glass is sealed and in the proper posi tion Ensure that the ow of combustion and ventilation air is not obstructed front grille...

Страница 38: ...r of the appliance May need to remove face front first 5 Push in gas control knob slightly and turn clockwise to the OFF position Do not force 6 Wait five 5 minutes to clear out any gas Smell for gas...

Страница 39: ...detectors Smoke and odors may be irritating to sensitive individuals CAUTION Prevent accidental appliance operation when not attended Unplug or remove batteries from remote control if absent or if ap...

Страница 40: ...e thermocouple connection at the gas valve is fully inserted and tight hand tighten plus 1 4 turn Disconnect the thermocouple from the valve place one millivolt lead wire on the tip of the thermocoupl...

Страница 41: ...g exhaust gases back into the system Check for proper vent connection at ue collar and all vent joints c Horizontal vent improperly pitched The horizontal vent cap should slope down only enough to pre...

Страница 42: ...ratching or slamming glass Do NOT use abrasive cleaners Use a hard water deposit glass cleaner on white lm Do NOT clean glass when hot Turn off appliance after 3 4 hours of operation and ALLOW TO COOL...

Страница 43: ...aint as neces sary 2 Replace appliance if rebox has been perforated Burner Ignition and Operation 1 Verify burner is properly secured and aligned with pilot or igniter 2 Clean off burner top inspect f...

Страница 44: ...for reference only For clearances refer to Section 3 Figure 12 1 Appliance Dimensions B C A K L M N O D E F G H I J Location Inches Millimeter Location Inches Millimeter A 27 3 8 695 I 19 3 8 492 B 7...

Страница 45: ...9 1 4 in 235mm 6 1 2 in 165mm 6 5 8 in 168mm 17 24 in 432 610mm 11 3 4 in 298mm 5 3 4 in 146mm 6 5 8 in 168mm 6 3 8 in 162mm 6 1 2 in 165mm 9 5 8 in 244mm 6 5 8 in 168mm 6 1 2 in 165mm 6 3 8 in 162mm...

Страница 46: ...vanized SLP48M 46 DVA 48 4DT 48 4D4 SV4L48 48 Pipe Length Black SLP48 BK 46 DVA 48B 4DT 48B 4D4B SV4LB48 Adjustable Length 3 6 Black SLP6A BK Adjustable Length 3 6 Galvanized SLP6AM Adjustable Length...

Страница 47: ...e Roof Flashing 4 to 8 pipes 6 RF4 8M Storm Collar SLP SCM 46DVA SC 4DT SC 4DSC SV4FC Trim Plate Black 4DT TP 4DFPB SV4LA Wall Support Band SLP HVSM 46 DVA WS 4DT WS B 4DWS SV4BM Wall Thimble Support...

Страница 48: ...r Retainer Assembly 20 Igniter Piezo 3 Door Assembly 12 Side Kit 21 Switch Bracket 4 Burner Assembly 13 Valve Bracket 22 Grille Rear Vent 5 Pilot Assembly 14 Back Shield Lower 23 Grille Top Vent 6 Ref...

Страница 49: ...ting Bracket Bottom 7009 102 25 Cast Mounting Bracket Top 7009 101 Component Pack Includes ON OFF Valve Mineral Wool Pilot Injector EZ LP 35 Conversion Regulator S I T LP LP Ori ce 073 Conversion Labe...

Страница 50: ...in 200 2940 Flex Line 3 8 Flare x 22L 7000 197 Gasket Cover Plate 7010 160 Gasket Elbow 460 0610 Glass Assembly 7011 015 22 Grille Rear Vent Matte Black 844 9830 22 Grille Rear Vent Porcelain Cr me 8...

Страница 51: ...art below Topaz Shipping Kit 842 5140 13 Valve Bracket 7009 104 15 Valve S I T LP 842 0230 15 Valve S I T NG 842 0240 Wire Harness 7009 114 IMPORTANT THIS IS DATED INFORMATION The most current informa...

Страница 52: ...celain Mahogany 844 9810 Warming Shelves Porcelain Midnite Blue 844 9821 Warming Shelves Powder Coat Creme WSLG CCR Warming Shelves Powder Coat Linden Green WSLG CLG IMPORTANT THIS IS DATED INFORMATIO...

Страница 53: ...September 1 2008 Page 53 Quadra Fire Topaz 7009 113G F Service and Maintenance Log Date of Service Performed By Description of Service...

Страница 54: ...onditions Exclusions and limitations 9 01 08 CONDITIONS EXCLUSIONS LIMITATION OF LIABILITY This warranty applies to the original owner and is transferable up to two years from date of purchase to the...

Страница 55: ...ine uorine or other damaging chemicals the appliance is subject to prolonged periods of dampness or condensation or there is any damage to the appliance or other components due to water or weather dam...

Страница 56: ...This product may be covered by one or more of the following patents United States 4593510 4686807 4766876 4793322 4811534 5000162 5016609 5076254 5113843 5191877 5218953 5263471 5328356 5341794 534798...

Отзывы: