Page 22
7037-135E
September 1, 2008
R
4300 Wood Stove Series (ACC)
Pedestal and Ash Removal System (Cont’d)
Figure 22.3
Grate
ARS
Channel
Replace both bricks
back into firebox
Figure 22.2
Cover
Plate
Ash Removel
Drawer
Adapters
Oak
Pedestal
Trim
Figure 22.1
Installing Pedestal Assembly
1. Remove screws on adapter and slide pedestal over
adapter on bottom of stove.
Figure 22.1.
2. Line up holes in sides of pedestal with holes in adapter.
. Securely tighten pedestal into place.
4. Carefully stand stove up and place in desired location.
5. Slip wooden decorative strips onto pedestal edges.
Finishing the ARS Installation
1. Re-install the ARS channel that was removed in Step on
page one and secure with 2 bolts previously removed.
S
et the grate into the ARS channel Replace the 2
front cut bricks.
Figure 22.2.
2. Install the ash drawer.
. Check to make sure baffle boards and ceramic blanket are
in their proper locations.
(see page 29)
.
NOTE:
If installing a floor installation of an outside air kit on a
Step Top model with a pedestal assembly you must attach
the enclosed cover plate to the back of the stove. Other
wise you may discard this piece.
Figure 22.3.