Page 18
7014-188
September 16, 2009
R
CB1200-I Pellet Insert
7
Appliance Set-Up
A. Rear Shroud Installation
2. Rear vent installations
Parts Required:
Part 811-0680, Rear Shroud Kit.
Part 811-0690, Rear Vent Kit
Includes: Rear Vent Adapter and fastener package.
Tools Required:
Electric drill, 1/8 inch drill bit, Phillips screw driver, 3/8 inch
wrench & 7/16 inch wrench, (7/16 inch socket wrench & high
temperature silicone adhesive are also required for rear vent
installations).
Knock-Out Rear
Vent Access
Outside Air V
ent
Pipe Access
Right Corner
Left Corner
Top Vent Opening
Left Corner
Filler Piece
REAR SHROUD TOP
VENT PART 811-0650
1. Top Vent Installations
Parts Required:
Part 811-0680, Rear Shroud Kit.
Includes: Six galvanized steel shroud pieces, two cover
plates and fastener package.
Part 811-0650, Rear Shroud Top Vent
Includes: Vent pipe and two 1/4 - 20 x 3/4 inch bolts with
nuts.
Part 811-0660, 3 inch Top Vent Adapter
or
Part 811-0670,
4 inch Top Vent Adapter
Vertical Exhaust
Transition Pipe
Top Vent Adapter
Figure 18.5
1. Remove the top vent adapter from the vertical exhaust
transition pipe.
Figures 18.2 and 18.5.
2. Use 2 screws to attach left corner fi ller piece of rear
shroud to the insert hopper.
Figures 18.1 and 18.2.
3. Use (2) 1/4 - 20 x 3/4 inch bolts with nuts to install rear
shroud top vent to the exhaust transition. See boxed
area in
Figure 18.3
. (Circled area, top vent adapter,
will be installed later).
4. Install the left shroud panel corner at 3 points, 2 screws
into back of hopper and 1 down into the fi ller piece).
Figure 18.4
Complete the following procedures, based on
your venting installation, prior to installing
the rear shroud kit.
(Note: All photos depict top vent
installation).
Top Vent Installation Preparation
Filler Piece
Left Corner
Piece
Rear Shroud
Top Vent
Figure 18.1
Figure 18.2
Figure 18.3
Figure 18.4