Quadra-Fire Explorer II series Скачать руководство пользователя страница 7

August 

13, 

2018     7061-197P 

     

7

Explorer II

ATTENTION INSTALLER:

Follow this Standard Work Checklist

This standard work checklist is to be used by the installer in conjuction with, not istead of, the instructions contained in this installation manual.

Customer: 

Date Installe: 

Lot / Address: 

Location of Appliance: 

Installer: 

Dealer / Distributor Phone #: 

Serial #: 

Model: 

WARNING! Risk of Fire or Exposion!

 

Failure to install appliance according to these instruction can lead to a fire or explosion.

Appliance Install

Verified clearances to combustibles.

Appliance is leveled and connector is secured to appliance.

Hearth extension size/height decided.

Outside air kit installed.

Floor protection requirements have been met.

If appliance is connected to a masonry chimney, it should be cleaned and

inspected by a professional. If installed to a factory built metal chimney, the 

chimney must be installed according to the manufacturer’s instructions and 

clearances.

Chimney

Chimney configuration complies with diagrams.

Chimney installed, locked and secured in place with proper clearance.

Chimney meets recommended height requirements (14-16 feet).

Roof flashing installed and sealed.

Terminations installed and sealed.

Clearances

Combustible materials not installed in non-combustible areas.

Verified all clearances meet installation manual requirements.

Mantels and wall projections comply with installation manual requirements.

Protective hearth strips and hearth extension installed per manual requirements.

Appliance Setup

All packaging and protective materials removed.

Firebrick, baffle and ceramic blanket installed correctly.

All labels have been removed from the door.

All packaging materials are removed from inside/under the appliance.

Manual bag and all of its contents are removed from inside/under the appliance 

and given to the party responsible for use and operation.

Hearth & Home Technologies recommends the following:

•     Photographing the installation and copying this checklist for your file.

•     That this checklist remain visible at all times on the appliance until the installtion is complete.

Comments:  Further description of the issues, who is responsible (Installer/Builder/Other Trades, etc.) and corrective action needed:

Comments communicated to party responsible ____________________________ by _____________________ on ___________

(Builder / Gen. Contractor)

(Installer)

(Date)

_________________________________________________________________________________

______________________________________________________________________________

______________________________________________________________________________

________________________________________________________________________

___________________________________________________________________________________

___________________________________________________________________

___________________________________________________________________________________

____________________________________________________________________________________

YES IF NO, WHY?

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

G. Install Checklist

Содержание Explorer II series

Страница 1: ...revendeur ou visitez www quadrafire com If the information in these instructions is not followed exactly a fire could result causing property damage personal injury or death WARNING Do not store or us...

Страница 2: ...Chimney Termination Requirements 12 C 2 10 3 Rule 12 D Chimney Height Rise and Run 13 E Venting Components 13 F Chimney Systems 13 G Installing Chimney Components 15 H Proper Draft 15 5 Appliance Set...

Страница 3: ...from the low and high EPA tests using Douglas Fir dimensional lumber A peak BTU out of the appliance calculated using the maximum first hour burn rate from the High EPA Test and the BTU content of cor...

Страница 4: ...affle and other interior components NOTE Hearth Home Technologies manufacturer of this appliance reserves the right to alter its products their specifications and or price without notice Improper inst...

Страница 5: ...chimney heights Ideal performance is with height of chimney between 14 16 feet 4 26 4 88m measured from the base of the appliance C Negative Pressure Negative pressure results from the imbalance of ai...

Страница 6: ...ling winds during the heating season Ensure adequate outdoor air for all combustion appliances and exhaust equipment Ensure furnace and air conditioning return vents are not located in the immediate v...

Страница 7: ...he party responsible for use and operation Hearth Home Technologies recommends the following Photographing the installation and copying this checklist for your file That this checklist remain visible...

Страница 8: ...t View Figure 8 3 Side View 12 1 4 514MM 27 686mm 29 737mm 20 508mm 29 737mm Figure 8 2 Top View 13 3 8 340mm 7 8 22mm 2 3 8 60mm 25 7 8 657mm 3 8 9mm 29 737mm Figure 8 4 Side View with horizontal flu...

Страница 9: ...he appliance See exception WARNING Fire Risk Hearth pads must be installed exactly as specified High temperatures or hot embers may ignite concealed combustibles Corner hearth pad dimensions with sing...

Страница 10: ...4 1175 6 1 2 165 N A N A 55 1397 N A For alcove only Six inch diameter listed Double wall air insulated connector pipe with UL103 HT listed factory built Class A chimney or masonry chimney Maximum dep...

Страница 11: ...space enclosed by the building envelope This helps to produce more draft especially during lighting and die down of the fire Penetrate the highest part of the roof This minimizes the affects of wind...

Страница 12: ...or when there are other factors that affect flue draft B Chimney Termination Requirements Follow manufacturer s instructions for clearance securing flashing and terminating the chimney Figure 12 1 12...

Страница 13: ...Listed Chimney Storm Collar Wall Support Roof Brace if required Thimble Figure 13 1 Prefabricated Exterior Chimney E Venting Components Chimney Connector It is also known as flue pipe or appliance pip...

Страница 14: ...ey Figure 14 2 2 Entry hole to masonry chimney must be lined with an 8 inch 203mm minimum diameter clay liner or equivalent secured with refractory mortar 3 Construct a 17 inch x 17 inch 432mm x 432mm...

Страница 15: ...is must be at least 24 gauge mild steel or 26 gauge blue steel The sections must be attached to the appliance and to each other with the crimped male end pointing toward the appliance All joints inclu...

Страница 16: ...materials from packing box 2 Floor Rear Installation Cut a 4 inch 102mm hole in outside wall or floor to accommodate outside air piping Use 4 inch 102mm aluminum metal flex or rigid piping to directly...

Страница 17: ...agnet under the bottom left rear corner See Owner s Manual for detailed operating instructions for the blower and snap disc Figure 17 1 Shock Risk Do NOT remove grounding prong from plug Route cord aw...

Страница 18: ...op or rear venting installation The appliance is shipped with the flue collar in the top vent position Converting Collar For Rear Vent Installation and Installing Required Horizontal Flue Shield 1 Rem...

Страница 19: ...ion requirements must be followed precisely 9 Use silicone to create an effective vapor barrier at the location where the chimney or other component penetrates to the exterior of the structure NOTE Of...

Страница 20: ...20 7061 197P August 13 2018 Explorer II Date of Service Performed By Description of Service 7 Reference Materials A Service Maintenance Log...

Страница 21: ...it Floor Rear OAK ACC Outside Air Collar Assembly 7033 039 Outside Air Shield 33271 Y Firescreen SCR 7061 FASTENERS Avk Rivnut Repair Kit 1 4 20 3 8 16 Rivnut Tools RIVNUT REPAIR Y Nut Ser Flange Smal...

Страница 22: ...purchased installed _________________________________________________________________________ Serial Number ____________________________________ Location on appliance ___________________________ Deal...

Отзывы: