September 28, 2016
7038-207G
21
5700 STEP TOP ACC
Figure 21.1
D. Door Handle Assembly
1. Slide door handle through door.
2. Install additional washer(s) as shown in
Figure 21.1
3. Install key in groove.
4. Align groove in latch cam with key; slide latch cam over
shaft
5. Install locknut but do not over tighten, the handle needs
to rotate smoothly.
6. Install fiber handle.
Figure 21.1
CAUTION!
Do not over tighten lock nut. The door handle
needs to move smoothly.
Locknut
Latch Cam
Spacing
Washers
Door Cross Section
(example)
Door Handle
Fiber Handle
Square
Key
E. Baffle Removal
1. Remove all ash from the firebox, and extinguish all hot
embers before disposal into a metal container.
2. The baffle board has 2 pieces. With the ceramic blanket
still in place, slide one baffle piece over the top of other
one and pull out top piece through the door opening and
then remove bottom baffle piece.
Figure 21.2.
3. Remove the ceramic blanket.
4. Re-install the ceramic blanket and smooth out the blanket.
4. Slide the baffle pieces one piece at a time underneath the
blanket. Be sure the baffle boards are even with the front
manifold tube and is resting on all tubes.
Figures 21.2 and
21.3.
Figure 21.2
Figure 21.3
2 pc Baffle Board
Ceramic Blanket on Top
Tube Channels
Baffle Board even with front
tube & resting on all tubes
Burn Rate
Air Control
Automatic
Combustion
Control