quadient AS-CSD6 Скачать руководство пользователя страница 5

5

 

Installing the Conveyor 

1.

 

Roll the conveyor up to the machine that requires stacking of 
its output. 

2.

 

Adjust the height of the conveyor to match the output end of 
the machine by loosing (counterclockwise) the two large knobs 
(one on each end), raising the conveyor to the proper height and 
tightening (clockwise) the two knobs one at a time. 

WARNING 

THE CONVEYOR IS VERY HEAVY. 

IT IS RECOMMENDED THAT TWO 

PEOPLE WORK TOGETHER TO 

RAISE IT INTO THE PROPER 

OPERATING HEIGHT.  A BLOCK OF 

WOOD UNDER THE CENTER OF 

THE LEG WILL HELP PREVENT 

INJURY DURING SETUP.

 

 

Operating the Conveyor 

1.

 

Plug the conveyor into a properly grounded wall outlet using the 
power cord supplied.  Turn on the main power switch located 
above the power receptacle. 

CAUTION

 

THE CONVEYOR IS DESIGNED TO BE 

PLUGGED INTO A GROUNDED OUTLET.  

FOR YOUR SAFETY, DO NOT REMOVE THE 

GROUND PIN FROM THE LINE CORD. 

 

2.

 

Adjust the speed control knob on the front of the conveyor to 
obtain the proper speed.  If the conveyor does not start check to 
see that the Emergency Stop switch has been released. 

NOTE: 

THE EMERGENCY STOP SWITCH IS 

ACTIVATED BY PUSHING IN ON IT AND RELEASED BY 
TURNING IT CLOCKWISE IN THE DIRECTION OF THE 
ARROWS.

 

 
 

 
 

3.

 

If you are using the conveyor in the right angle mode (conveyor 
is perpendicular to the machine feeding it) then adjust the Right 
Angle Guide as follows: 

a)

 

With the conveyor belt stopped, loosen the two ball rack 
locking levers [A]and raise the ball rack [B].  Place a piece 
of media under the ball rack, then lower, and lock the 
levers. 

b)

 

Loosen the locking screws [C] and move the ball rack 
assembly in or out to center the media on the belt. 

4.

 

Feed stock through the machine and onto the conveyor to check operation. 
 

 

 

 

 

Содержание AS-CSD6

Страница 1: ...1 User Guide Conveyor Stacker AS CSD6 TB 690...

Страница 2: ...ontents SAFETY PRECAUTIONS 3 SETTING UP THE CONVEYOR 4 INSTALLING THE CONVEYOR 5 OPERATING THE CONVEYOR 5 TROUBLESHOOTING 6 DROP TRAY KIT OPTION INSTALLATION INSTRUCTIONS 7 OPTIONAL ACCESSORIES 8 SPEC...

Страница 3: ...be accessed by a qualified service representative Report any damage of covers to your service representative This machine requires periodic maintenance Contact your authorized service representative...

Страница 4: ...ppropriate end of the conveyor using the three screws supplied NOTE THE STACKING TRAY CAN BE MOUNTED TO EITHER END OF THE CONVEYOR DETERMINED BY THE DIRECTION THE BELTS TRAVEL 3 If the conveyor is to...

Страница 5: ...EYOR IS DESIGNED TO BE PLUGGED INTO A GROUNDED OUTLET FOR YOUR SAFETY DO NOT REMOVE THE GROUND PIN FROM THE LINE CORD 2 Adjust the speed control knob on the front of the conveyor to obtain the proper...

Страница 6: ...nd motor circuit breaker and replace or reset if necessary The fuse holders and circuit breaker are located on the rear of the conveyor next to the power inlet WARNING DISCONNECT THE POWER CORD WHEN C...

Страница 7: ...g DT 860R these items will be installed on the left hand end of the conveyor 1 Remove the three screws attaching the Stacking Tray to the conveyor Remove the Stacking Tray and discard 2 Install the Dr...

Страница 8: ...ht use only DT 860R Drop Tray Kit for Right to Left use only Specifications Length 72 Width 18 Height 30 to 36 Adjustable Belt Speed 15 to 250 feet per minute Power 115 VAC 60Hz Shipping Weight 100 lb...

Страница 9: ...9 Quadient June 6 2022...

Отзывы: