Installation Manual
2. Installation Preparations
23
www.qtech.ru
2.
INSTALLATION PREPARATIONS
When the router is delivered, there is the packing list. Please confirm
whether the accessories are complete and good according to the items in
the packing list. If there is damaged or loss, please contact QTECH technical
staff to replace.
2.1.
Check Router Running Environment
QSR-2920 series routers must be used indoors. To ensure the normal running of the router,
take the corresponding measures to meet the environment requirement of the router running:
Air conditioning and ventilation system can ensure the normal running temperature and
humidity conditions of the router. For details, refer to Appendix C1
The good grounding is the basis of the router running and the important guarantee
conditions of preventing lightning and resisting interference. Ensure that grounding meets
the grounding specifications. For details, refer to
Ensure that the cleanness of the equipment room meets the requirement. Do not place the
router in the environment with lots of dust, such as in the being renovated passage.
2.2.
Safety Precautions
1.2.2.
General Safety
Keep the router clean and dust-free; do not place the router in the damp
place.
2.2.2.
Electrical Safety
Please check whether there are potential dangers. For example, the power
is not grounded, power supply grounding is not reliable, and the ground is
wet.
Before moving the router, be sure to remove all external cables (including
power cable).