18
L-TRACK ANCHORAGE AND END CAPS INSTALLATION
N
O
P
R
8. Securely fasten bolts and lock nuts as shown in (N)
ensuring at least 2-3 threads are sticking out.
Recommended torque = 25 FT/LB (47Nm)
9. Clean out debris. Place sealant inside floor opening and
install End Caps into floor (O).
10. Secure End Caps to floor with screws (P).
11. Clean out debris from L-Track (and end caps) with
pressurized air (Q).
12. Place L-Track and snap into place (R).
Q
8
Floor
8
Locknuts
8
L-Track
8
2-3 Threads
8
Floor
8
Sealant
8
End Caps
8
Screws
8
Floor
8
Floor
8
Clean Out Debris
8
L-Track Cover
8
Floor
L-Track Cover
Installation Sequence