Back Panel
S5
300-24
P4TS
Grounding Point
Installation Requirements
Before you begin the installation, make sure that you have the following:
Phillips screwdriver.
Standard-sized, 19" wide rack with a minimum of 1U height available.
Category 5e or higher RJ45 Ethernet cables for connecting the network devices.
Site Environment:
Make sure that the workshop is well-ventilated, the heat of electrical devices is well-discharged and
sufficient air circulation is provided for device cooling.
Avoid damage devices by following the electrostatic discharge prevention procedure.
Put the machine box in a place where cool air can blow off the heat inside the machine box. Make
sure the machine box is sealed because the opened machine box will reverse the cool airflow.
www.qsfptek.com
5
/
11
AC Power
www.qsfptek.com
V1.0
5
/
11