background image

6

Mount the Bracket

Refer to Figure 9. Horizontal orientation shown.

1.  Feed the Ethernet cable through the bracket before mounting.

2.  Place the four Wall Isolation Washers between the wall and 

the bracket.

3.  Attach the bracket to the wall using mounting hardware (not 

included) suitable for the wall composition – wood studs, 
concrete, brick, metal studs, etc.

4.  Continue to “Wire the Loudspeaker”.

NOTE

: If you are not feeding the Ethernet cable through the wall, 

mount the bracket so that the center notch is pointing toward the 
cable entry – typically toward the display (Figure 10).

— Figure 9 — 

— Figure 10 — 

Place the Bracket

Refer to Figure 8. Horizontal orientation shown.

1.  Place the bracket on the wall – for example, centered under 

a display.

2.  Level the bracket, and then trace the anchor slots.

3.  Mark the cable exit location.

4.  Set the bracket aside.

5.  Draw a level line horizontally through the top wall trace 

marks and vertically through the left and right side trace 
marks.

6.  Drill or cut a hole for the cable.

7.  Pull the cable through.

1

2

3

5

7

— Figure 8 — 

Mounting and Cabling Options

You can mount the soundbar horizontally or vertically, with the Ethernet cable routed through the wall (directly behind the bracket) or 
through the bracket’s Cable Pass Notch. For ease of access when releasing the speaker from the bracket in the horizontal position, it is 
recommended to position the bracket with the Release Latches (Figure 6) on the bottom.

NOTE: 

 

If you are not feeding the cable through the wall and bracket, position the Cable Pass Notch toward the display, as 

shown in Figure 7. In this case, orient a horizontally-positioned bracket with the Release Latches on top.

— Figure 7 — 

Содержание Q-SYS NL-SB42

Страница 1: ...Hardware User Manual NL SB42 4 Two way Network Soundbar TD 001638 01 A TD 001638 01...

Страница 2: ...professional engineer when any doubt or questions arise regarding a physical equipment installation Maintenance and Repair WARNING Advanced technology e g the use of modern materials and powerful ele...

Страница 3: ...quipment into an outlet on a circuit different from that to which the receiver is connected Consult the dealer or an experienced radio TV technician for help Environmental Expected Product Life Cycle...

Страница 4: ...E Port For Q LAN connection The NL SB42 is a PoE Enabled Device PoE Type 2 Class 4 capable Use a suitable PoE network switch or supply connected to this port 2 ID Button Press to identify this product...

Страница 5: ...nt Installation IMPORTANT Mount to a surface capable of supporting the weight of the soundbar WARNING Install the system in accordance with local building codes and regulations Use a licensed contract...

Страница 6: ...vel the bracket and then trace the anchor slots 3 Mark the cable exit location 4 Set the bracket aside 5 Draw a level line horizontally through the top wall trace marks and vertically through the left...

Страница 7: ...ects 1 Review the soundbar s alignment with other objects Figure 13 2 Release the soundbar from the wall bracket See Release the Soundbar 3 Re attach the soundbar in the desired position NOTE Sliding...

Страница 8: ...to a suitable PoE network switch the RJ45 jack LEDs will indicate network status Left LED Right LED Yellow Green Dark Disconnected Dark Disconnected 10Mbps 100Mbps Solid Link Solid 1 Gigabit Link Flas...

Страница 9: ...Support and Customer Care including their phone numbers and hours of operation https www qsc com contact us Warranty For a copy of the QSC Limited Warranty visit the QSC LLC website at www qsc com 202...

Отзывы: