Installing the System Hardware
51
Figure 3-24
Third Step of the Slide Rails Installation
4.
Fourth step of the slide rails installation
。
Pull the middle member fully extended in locked position.
。
Ensure ball bearing retainer is located at the front of the middle member.
。
Insert chassis into middle-outer member.
。
When hitting the stop, pull/push release tab to unlock and retract chassis into rack.
。
Use M5x20 screws to fasten the chassis ear.
9
INFORMATION:
9
If you purchase optional slide rails, M5x20 screws that are dedicated for
optional slide rails are packed in the screws pack.
Содержание XCubeSAN XS5224D
Страница 10: ...viii Copyright 2017 QSAN Technology Inc All Right Reserved Appendix 114 End User License Agreement EULA 114...
Страница 121: ...Quick Maintenance 103 Figure 6 21 Example of a Failed Power Module Figure 6 22 Example of a Failed Flash Module...
Страница 125: ...Support and Other Resources 107 Figure 7 1 Download Service Package in the SANOS UI...
Страница 129: ...Support and Other Resources 111...