27
3.
Prepare a new PSU, and push it back to the slot until you hear a click. Please make sure
that the direction of the PSU is correctly installed, to prevent any potential damage by
improper installation.
3.6.
Install the Rail Kits
Rail kit is an optional accessory XCubeNAS, if you did not purchase QSAN qualified rail kit,
you can skip the steps of the system installation tasks. If you want to purchase QSAN
qualified rail kit: full extension and thin slide with tool-less bracket: AA612508 series, please
contact QSAN authorized reseller.
CAUTION:
The populated XCubeNAS system can be very heavy, to avoid any
potential injury or harm to installers, or damage to the system, we strongly
recommend at least two certified operators or engineers perform the
system installation.
1.
Pull the inner rail out and slide the intermediate rail back.