Operations Manual
MAN-038 March 2019
Page 56 of 100
7
Attach the serviced dust cover assembly to the gamma-ray source projector with the socket head
cap screw (SCR311). Reattach the dust cover assembly to the gamma-ray source projector and
ensure the cable will allow attachment to the lock mechanism and storage bracket above the lock
mechanism. Replace the dust cover cable if it’s frayed or broken.
8 Check the plunger lock for proper function by using the key to engage and unlock. Engage the
dust cover assembly to the lock mechanism to ensure smooth operation and proper function.
See reference drawings with part numbers in Figures 12 and 13.
h. Post Maintenance Functional Safety Check of the Entire System
1 Operationally test for proper function of the entire system by using the serviced gamma-ray
source projector, a source guide tube with a bayonet-fitting, the remote controls and the
applicable mock source assembly (A424-14XL or A424-13XL).
2 Attachment of the bayonet source guide tube to the outlet port must be smooth and without
resistance. Rotate the outlet port mechanism to enable exposure of the demo source assembly.
3 Connect the (serviced) remote controls to the demo source assembly connector and the device
locking mechanism.
4 Push the lock slide into the EXPOSE position and crank the remote control cable into the
exposure mode.
5 While cranking the mock source assembly from the gamma-ray source projector, carefully feel for
resistance or snags.
6 During retraction of the mock source assembly back into the gamma-ray source projector,
carefully feel for any resistance or snags during movement.
7 Conclude the test by verifying the lock slide automatically secures the mock source assembly.
Action of the lock slide should be smooth with an audible ‘snap’ during automatic securing. After
automatic securing, attempt to expose the demo source assembly from the gamma-ray source
projector to confirm a positive capture. Repeat this testing several times.
8 If resistance, snags or sluggish movement of the lock slide is discovered during this testing,
remove the outlet port and locking mechanism plates to determine the cause. Repeat all safety
function tests if any additional servicing is required.
9 If the Model 550 jumper gauge was used during the servicing, clean the jumper gauge in solvent.
Lubricate the inner sleeve with light oil while moving the sleeve back and forth. Apply a light coat
of oil over the entire jumper before storage.
10 After performing the full servicing of the system, reload the gamma-ray source projector by
performing a source transfer. After performing the source exchange from the source changer into
the gamma-ray source projector, conduct radiation surveys of the gamma-ray source projector,
source guide tube and source changer to confirm the sealed source is fully shielded and secured
within the gamma-ray source projector. Survey the surface of the gamma-ray source projector to
ensure the measureable dose/rate is less than 2 mSv/hr (200 mR/hr) on the surface and less
than 50 µSv/hr (5 mR/hr) at 1 meter (to comply with ANSI/ISO requirements).
11 If previously removed for the servicing of the gamma-ray source projector, install the source
identification tag to the gamma-ray source projector.