![background image](http://html1.mh-extra.com/html/qrs-music-technologies/qrs-pno3/qrs-pno3_installation-manual_767328051.webp)
Comple ng
the
Installa on
51
Install
the
Rail
Covers
Install
the
two
key
solenoid
rail
covers
using
“L”
brackets
Shutdown
the
system
and
unplug
the
unit
from
AC
power.
Cut
notches
in
the
cover
for
the
sustain
lever
and
cables.
A ach
the
eight
“L”
brackets
to
the
two
rail
cover
sec ons
using
bolts
and
nuts.
A ach
the
two
sec ons
to
the
keybed.
The
cover
sec ons
overlap.
Refer
to
the
QRS
PNO3
User
Guide
for
details
on
Adjustments
and
Opera on.
Содержание QRS PNO3
Страница 10: ...Installa on Procedure 10 Upright Piano Installa on Recommenda ons Balance Rail Pin 3 1 4 Minimum ...
Страница 30: ...Installa on Procedure 30 Installing the Steinway Sostenuto Assembly Order 70897 ...
Страница 41: ...Adjustment Procedures 41 Password qrsmusic When the PNO3 Ethernet port is used ...
Страница 42: ...Adjustment Procedures 42 ...
Страница 43: ...Adjustment Procedures 43 ...
Страница 46: ...Adjustment Procedures 46 ...
Страница 47: ...Adjustment Procedures 47 ...
Страница 48: ...Adjustment Procedures 48 ...
Страница 49: ...Adjustment Procedures 49 ...
Страница 50: ...Adjustment Procedures 50 ...
Страница 52: ...Warranty Informa on 52 ...