3–Installation
Installing a Switch
3-6
59265-02 B
If you are using the XPAK ports, remove the port covers, as shown in
.
Figure 3-2. Removing XPAK Port Covers
To install XPAK switch stacking cables, position the cable connectors with the
circuit board toward the mid-line of the respective switch faceplates, as shown in
. When installing the 3-inch XPAK switch stacking cable, insert the
cable connectors into the XPAK ports at the same time.
Figure 3-3. Installing XPAK Switch Stacking Cables
Circuit Board
Содержание SANbox 5800V Series
Страница 1: ...59265 02 B Installation Guide Stackable Fibre Channel Switch 5800V Series Firmware Version 8 0...
Страница 26: ...Preface Technical Support xxvi 59265 02 B...
Страница 70: ...2 Planning Fabric Management 2 32 59265 02 B...
Страница 90: ...3 Installation Installing Feature License Keys 3 20 59265 02 B...
Страница 110: ...5 Removal Replacement Power Supply Removal and Replacement 5 4 59265 02 B...
Страница 126: ...Installation Guide Stackable Fibre Channel Switch 5800V Series Glossary 8 59265 02 B...
Страница 133: ......