
61
4
61
Model
For piping longer
than 5 metres
Extra filling per
meter in grams
2.5 – 2.6 kW
20
3.1 – 3.6 kW
20
4.8 – 5.4 kW
20
Tabel 2
Only use coolant of the same type as stated on the type plate.
15. TEST RUNNING AFTER INSTALLATION
Perform test running after completing electrical safety check and gas leak check.
The test running time should last more than 30 minutes.
Check if all the functions works well during test running. Especially check whether the drainage of indoor
unit is smooth or not.
Содержание S5032
Страница 123: ...123...