
QD1 IO Expansion Module User Manual
32 Document Version V3.0 (2020-08-18)
Figure 4-9 Web Interface
4.2.4 Call QD1 instruction in GDE
Step 1
Call the IO control instruction <Signal.DIO(XXX) =True> or
<Signal.DIO(XXX) = False> in GDE.
⚫
Example: When Signal.DIO (101) =True, set Output 101 to 1;
⚫
Example: When Signal.DIO (102) = False, set Output 102 to 0;
Step 2
Set other output ports in sequence according to the examples above.
4.3 Configuration for connection to PC
Prerequisites:
Visual Studio 2015 installed on computer; personnel familiar with
Visual Studio development environment.
4.3.1 PC configuration
QD1 can be controlled via multiple terminals. Users can control QD1 via PC/host
computer in addition to QKM robot. Install Visual Studio 2015 before configuring PC. The
requirements for hardware installation are shown in Table 4-2 Requirements for