background image

 

36 

SHUTDOWN 

Extended Shutdown: 

If the boiler is not used for an extended period, the following operations must be performed: 
 

• 

Close the on-off valves connected to the 3WOOD Boiler. 

• 

Remove the ash and clean the flue gas path. 

• 

Assess whether the Technical Service needs to be contacted for more through cleaning. 

 
 
 

• 

Empty the system or add Non– Toxic antifreeze fluids to the heat system if there is danger of 
frost. 

• 

A container with powdered lime should be placed inside the boiler to absorb humidity. 

Maintenance: 

 

Periodical maintenance is a legal requirement and is essential for the safety, efficiency and life of the 
3WOOD Boiler. 
It must be performed by a qualified heating contractor at least once a year so as to clean the entire flue 
gas path : loading/combustion chamber, smoke box and flues. 

Routine Cleaning: 

 
Before starting any cleaning operations wait for the boiler to cool down. 
 

External Cleaning: 
 

The casing can be cleaned using cloths dipped in soap and water. 
For hard-to-remove stains, dip the cloth in a mixture of 50% water and denatured alcohol or other 
specific products. Once finished cleaning, carefully dry the 3WOOD Boiler. 
 

 
 

• 

Do not use abrasive products, petrol or trichloroethylene. 

• 

Always make sure there are NO hot coals underneath the ash. 

• 

Use suitable safety equipment. 

• 

The boiler is supplied without accessories, as cleaning can be performed using 
normal household utensils that can be purchased at shops that sell products for 
stoves and fireplaces. 

WARNING

 

WARNING

 

Содержание BIASI 3 WOOD

Страница 1: ...tor ____________________ Address _________________________ _________________________ Telephone Number _________________________ OWNER For service and repairs to the heating system please contact your...

Страница 2: ...licensed heating contractor We urge you to contact your installing contractor or distributor if you are in question about any aspect of your boilers performance Our main concern is that you are satisf...

Страница 3: ...ations 15 Layout of Main Components 16 Transporting and Minimum Clearances 17 Flue Gas Outlet and Combustion Air 18 Assembling the Casing 19 Installation of Controls 20 Installations of Flue Gas Parti...

Страница 4: ...ained non electrical zone valves in the zone controlled by the overheat control When references are made to tapping numbers please refer to the specifications sections All firewood used in this boiler...

Страница 5: ...or fluids to start the fire DO NOT burn garbage gasoline naphtha propane engine oil or other flammable materials DO NOT fire the 3WOOD during a power failure Use a wood stove during a power failure n...

Страница 6: ...ombustion or ventilation air to boiler Should overheating occur do not disconnect electrical supply to circulator Instead open all the flow checks external to the Boilers Do not use this boiler if any...

Страница 7: ...olid fuel boiler as the gas or oil fired boiler if any will be completely inoperative 1 Locate any flow check valves in the system See Pg 7 and completely unscrew the knob on the top of all these valv...

Страница 8: ...x to the desired level close the loading door securely Damage or injury will result if wood is not loaded carefully generally level with bottom of flue gas damper If loaded in correctly there is a ris...

Страница 9: ...mount of heat from a pound of equivalently dry wood no matter what species of tree it comes from But wood is not sold by the pound it is sold by the cord i e by volume Therefore the dense heavy woods...

Страница 10: ...0 Hickory Shagbark 20 7 24 8 19 Maple Red 15 0 18 8 24 Maple Sugar 18 4 21 3 16 Oak Red 17 9 21 3 19 Oak White 19 2 22 7 18 Pine Easter White 13 1 13 3 10 Pine Southern yellow 14 2 20 5 44 In Millions...

Страница 11: ...ned firewood Mixing small pieces preferably slab wood with every full load Never use only large wood usually less dry during mild weather when combustion is relatively slow The temperature in the stac...

Страница 12: ...t leaking creosote Chimney Cleaning Check your chimney and flue pipe at least twice during the heating season check it more frequently if you are new to wood or believe that there is soot or creosote...

Страница 13: ...and size of the coal you are using will affect the kindling rate and time required to establish a good deep coal bed There are no set rules but the following suggestions may help 1 Don t run too low a...

Страница 14: ...burn time and limit the number of times the door needs to be opened for refueling The front air grille for secondary air in the upper door and the flue gas damper are easily adjusted for tending the...

Страница 15: ...d with a cleanout door The heating system should be flushed cleaned of any slime and deposits vented and tested for water tightness The heating system should be equipped with a new expansion tank of s...

Страница 16: ...achment 5 Loading Combustion Chamber 17 Flue Gas Damper 6 Flue Gas Baffle 18 Flue Cleanout Door 7 Ash Collection Chamber 19 Casing 8 Ash Pit Door 20 Insulation 9 Ash Tray 21 1 1 2 Flange Supply Outlet...

Страница 17: ...ks extending at least 16 in front and 8 on either side of the 3 WOOD Construction of cement block pad under 3WOOD should extend at least 8 to each side of the boiler and extend at least 2 on either si...

Страница 18: ...ould be installed with male ends facing down and sealed using materials that can resist temperatures of at least 700 F 1 The solid fuel fired boiler does not draw steadily smells experiences smoke rol...

Страница 19: ...tening them C Insert them in the top of the four slots provided at the bottom of the boiler and secure them with the nuts NOTE The four top brackets 2 have holes for fastening the paneling to the tie...

Страница 20: ...dling the temperature gauge capillary tube to make sure it is not damaged and inserting the regulator in the opening provided D Secure it to the side panels using the screws supplied E Insert pressure...

Страница 21: ...d and press it fully into the rear of the boiler D Replace the cover 2 and secure it with the latch 3 E Open the door on the ash collection chamber 5 and insert the ash tray 6 Installation of Draft Re...

Страница 22: ...lator counter clockwise to the red 40 mark which is the minimum position 104 F D Remove chain from bag and cut it 32 long and install the hook and eyelet E Secure the handle 10 by tightening nut 11 Co...

Страница 23: ...regulator 3 to the middle position D Adjust the primary air damper 4 so it is open 1 32 at the bottom minimum opening using the screw 5 Lock it in place with the lock nut The regulator arm should be...

Страница 24: ...in the line to the radiation as close to the boiler as possible This branch tee should point up and will route the piping to the dump zone There must not be a valve or any potential restriction betwe...

Страница 25: ...ory authority PIPING NOTES 1 This drawing is meant to show system piping concept only 2 The installer is responsible for all equipment detailing required by local codes 3 Discharge of Pressure Relief...

Страница 26: ...m Mixing valve arrangements can be added to any of the systems described in this section or in fact to any conventional heating system as well We recommend the 4 way mixing valve to control the temper...

Страница 27: ...cal codes 2 Discharge of Pressure Relief Valve must be piped without valves to within 3 of the floor 3 Where required Low Water Cutoff must be installed in the Supply piping of the oil gas boiler 4 Th...

Страница 28: ...nal codes Use only copper conductors The 3WOOD must be installed without changing the function of the controls or rewiring the original boiler A wiring interconnection is permitted The electrical syst...

Страница 29: ...ting radiation supply and return lines from the oil or gas fired boiler Install pipe tees on the supply and returns from nipples coming out of the existing oil gas boiler NOTE Occasionally extra suppl...

Страница 30: ...installer is responsible for all equipment detailing required by local codes 2 Discharge of Pressure Relief Valve must be piped without valves to within 3 of the floor 3 Where required Low Water Cutof...

Страница 31: ...nal codes Use only copper conductors The 3WOOD must be installed without changing the function of the controls or rewiring the original boiler A wiring interconnection is permitted The electrical syst...

Страница 32: ...32...

Страница 33: ...59200637 17 Draft Regulator 59200638 18 Flue Gas Baffle Lock 59200639 19 Plate 59200640 20 Partition 59200641 59200641 59200642 59200643 21 Bottom Door 59200644 22 Hinge 59200645 23 Pin 59200646 24 Ga...

Страница 34: ...tion Assembly 59200601 59200602 59200603 59200604 3 Rear Panel 59200605 59200605 59200605 59200605 4 Cover Panel 59200606 59200607 59200608 59200609 5 Right Side Panel 59200610 59200611 59200612 59200...

Страница 35: ...35...

Страница 36: ...rformed by a qualified heating contractor at least once a year so as to clean the entire flue gas path loading combustion chamber smoke box and flues Routine Cleaning Before starting any cleaning oper...

Страница 37: ...the open expansion vessel Check operation and replace if necessary The boiler does not reach the set temperature Draft regulator Check operation and replace if necessary Chain unhooked or broken Hook...

Страница 38: ..._____________ ______________________ _________________________ ______________________ _________________________ ______________________ Boiler Performance Tests GROSS STACK TEMPERATURE ROOM TEMPERATURE...

Страница 39: ...and Biasi will not be responsible for 1 Components that are part of the heating system but were not manufactured by Biasi or QHT as part of the boiler 2 The workmanship of the installers of 3WOOD boi...

Страница 40: ...l Web Telephone Fax info qhtinc com www qhtinc com 800 501 7697 603 334 6401 QHT Inc 3560 Lafayette RD Portsmouth NH 03801 For service please contact 3 WOOD Boiler Manufactured by Biasi S p A Verona I...

Отзывы: