![QCT QuantaGrid Series Скачать руководство пользователя страница 51](http://html2.mh-extra.com/html/qct/quantagrid-series/quantagrid-series_service-manual_3123632051.webp)
I
NSTALLING
H
ARDWARE
OCP M
EZZANINE
B
OARD
2-26
2.11 OCP Mezzanine Board
Removing a OCP Mezzanine Board
1. Remove the system from the rack to power it down.
2. Remove the top cover. See
3. Remove the screws securing the OCP assembly to the chassis.
4. Remove the screws securing the OCP assembly to the standoffs on the chassis.
Figure 2-28.
Removing the OCP Mezzanine Board
CAUTION!
E
NSURE
ALL
POWER
IS
DISCONNECTED
FROM
THE
SYSTEM
BEFORE
PROCEEDING
.
!
Содержание QuantaGrid Series
Страница 1: ...Version 1 0 QuantaGrid Series D51PH 1ULH Hybrid Scale Out High Computing Storage Server Service Guide...
Страница 7: ...VI Connectors Connectors 5 1 Mainboard 5 1 Connectors 5 1 Regulatory and Compliance Information...
Страница 56: ...INSTALLING AN OCP MEZZANINE BOARD INSTALLING HARDWARE 2 31...
Страница 78: ...BIOS CHECKPOINTS 3 21 b Error code POST Error MRC Fatal Warning Code One reset switch To trigger system reset...
Страница 79: ...BMC Chapter 4 This section provides information and key features of BMC Baseboard Management Controller...
Страница 155: ...This page left blank intentionally...
Страница 156: ...Connectors Chapter 5 This section provides guidance information for the position and configuration of con nectors...
Страница 159: ......
Страница 160: ......
Страница 161: ......
Страница 162: ......
Страница 163: ......
Страница 164: ......
Страница 165: ...A VCCI A A...
Страница 166: ...A VCCI A A...
Страница 167: ......