2 Planning

2.3 Mounting options

TYPE OF

INSTALLATION

POINT MOUNTING SYSTEM

LINEAR MOUNTING SYSTEM 

Installation 

on mounting 

points

EN

4 x Mounting 

points

368.5

FB1

EN

4 × Mounting 

points

368.5

FB2

Installation

with insertion

profiles

not permitted

IP1

IP2

IP1

IP2

Specifications

MOUNTING 

OPTION

POSITION OF 

CLAMPS* [MM]

TEST LOAD 

PUSH / PULL** [Pa] 

DESIGN LOAD 

PUSH / PULL** [Pa] 

SAFETY

FACTOR

CL1a

130 - 350

5400 / 4000

3600 / 2660

1.5

20 - 450

5400 / 3600

3600 / 2400

20 - 650

2400 / 2400

1600 / 1600

CL1b

300 - 500

2400 / 2400

1600 / 1600

CL2a  

(with rails)

20 - 300***

3600 / 2400

2400 / 1600

CL2b

(without rails)

20 - 200

2400 / 2400

1600 / 1600

CL3

240 - 350

4000 / 4000

2660 / 2660

FB1

368.5

5400 / 4000

3600 / 2660

FB2

368.5

4000 / 4000

2660 / 2660

IP1

-

3600 / 3300

2400 / 2200

CL5

short side: 20 - 100

long side: 300 - 450

CL6a

outer clamps: 20 - 400

middle clamps: 560 - 1160***

8100 / 4000

5400 / 2660

CL6c

outer clamps: 20 - 400

middle clamps: 560-1160***

3600 / 3600

2400 / 2400

CL6d

short side: 20 - 250

long side: 560-1160***

4000 / 3600

2660 / 2400

*

**

***

Distance between outer edge of module and middle of the clamp; consider further details below.

Loads according to IEC 61215-2:2016 and UL 61730.

Rails must not be under the junction box.

MOUNTING OPTIONS

REQUIREMENTS

All

  The loads in the table are related to the mechanical stability of the solar modules. The 

mechanical stability of the mounting system including clamps has to be evaluated by the system 

supplier. The listed test load values have been determined with the following clamp parameters: 

clamp width = 40 mm and clamp depth = 10 mm.

  The system installer is responsible for the determination of location-specific load requirements.

  Ensure that the connection cables of the junction box do not run between laminate and 

mounting rails. 

  Modules bend under load. Therefore, sharp objects (e.g. screws, ballast stones, rail ends, rails 

with burrs or sharp corners) must not be placed near the module backside so as not to touch 

the laminate under load.

  Ensure that the junction boxes do not touch the mounting structure (e.g. shorts rails, ballast, etc.) 

or the rooftop under load. Clamps or insertion profiles etc. must not touch the glass (even under 

load).

  Unbalanced loads (e.g. snow overhangs, snowdrifts) which result in locally significantly 

increased loads must be removed or avoided by technical measures.

CL1a, CL2a, CL3,

CL6a, FB1, FB2

  Ensure that module frame is fixed directly on the rail of the substructure (no spacer allowed 

between the module and substructure).

CL1a

  At push test loads of 5400 Pa: The clamp position is variable in the given range but the distance 

between the clamps along the long side of the module (span) must not be larger than 1250 mm. 

CL1b

  Using of short mounting rails are permissible, if they overlap under the module less than 

210 mm. Minimum clearance between frame bottom edge and roof top must be ≥ 35 mm.

CL1b, CL2b, CL3,

FB2, CL6c, CL6d

  A minimum support depth of 15 mm is required on the back side of the module.

CL5

  The minimum required support depth on the module backside is 10 mm on long frame side and 

15 mm on short frame side.

IP1

  Ensure minimum support depth of 15 mm on the backside and 10 mm on the front side of the 

module.

FB1, FB2

  Use M8 corrosion-proof screws and washers (diameter ≥ 15.8 mm) for mounting slots (Detail A, 

Fig.1). Mounting screws and washers should have the same material properties.

CL6c, CL6d

  Use of short mounting rails under the modules are permissible, if they do not touch the laminate 

under load.

2 Planning

2.3 Mounting options

Содержание Q.PEAK DUO-G10.X Series

Страница 1: ...Installation and operation manual Q PEAK DUO G10 X solar module series...

Страница 2: ...the solar modules This manual Other applicable stipulations such as country specific regulations for pressure equipment operational safety hazardous goods and environmental protection Regulations and...

Страница 3: ...itional information see the relevant datasheet of the module provided at www qcells com PRODUCT LINE Q PEAK DUO G10 Q PEAK DUO G10 Q PEAK DUO G10 a Q PEAK DUO G10 a Q PEAK DUO BLK G10 Q PEAK DUO BLK G...

Страница 4: ...fastened to the ground the roof or the fa ade Forces acting on the module are relayed to the mounting substructure Ensures sufficient rear ventilation of the module Avoid the usage of different metals...

Страница 5: ...termination of location specific load requirements Ensure that the connection cables of the junction box do not run between laminate and mounting rails Modules bend under load Therefore sharp objects...

Страница 6: ...ulating the current measurement values ISC of conductors Sizing of control systems connected to the outlets of the solar modules Please follow the valid national guidelines for the installation of ele...

Страница 7: ...insulated tools Do not carry out the installation alone Only install undamaged modules and components Do not modify the module e g do not drill any additional holes 3 Installation 3 1 Safety and trans...

Страница 8: ...he inverter and the wiring with extreme caution Ensure that the modules are disconnected at the inverter prior to separation Be sure to observe the time intervals specified by the inverter manufacture...

Страница 9: ...e condition To avoid complex cabling arrangements it is often advantageous to rotate some modules 180 Module orientation can clearly be identified from the front side by the serial number and barcode...

Страница 10: ...Please contact an installer or Qcells Technical Customer Service Department Dispose of modules in accordance with the local disposal regulations 4 Electrical connection 4 4 After installation Ensure t...

Страница 11: ...occur Remove snow and ice carefully without force e g with a very soft broom Do not scratch off dirt Module cleaning has to be done by qualified personnel according to the state of the art and taking...

Страница 12: ...stallation manual solar modules Q PEAK_DUO G10 X_2022 06_Rev02_EN Hanwha Q CELLS GmbH OT Thalheim Sonnenallee 17 21 06766 Bitterfeld Wolfen Germany EMAIL WEB TEL FAX sales qcells com www qcells com 49...

Отзывы: