background image

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.MAXX-G4

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.MAXX-G4

16

17

4 Electrical Connection

4.2 Electrical installation safety

4 Electrical Connection

4.3 Connection of modules

Danger! Risk of fatal injury due to electric shock!

  Be sure to maintain the time intervals as specified by 

the inverter manufacturer between switching off the 
inverter and beginning any further work.

Danger! Risk of fatal injury due to electric shock!

  Never plug or unplug the cable when under load. 

Modules must not carry any current.

1. Switch off the inverter.

OFF

2. Switch off the DC circuit breaker.

3.  Measure shutdown in DC String. 

(no DC current flow).

4.  Disconnect plugs by the use of appropriate 

and qualified tools of the manufacturer.

5.  When connecting the modules proceed in  

reverse order.

Danger! Risk of fatal injury due to electric shock!

  Electrical work may only be performed by qualified 

and skilled personnel (see page 3).

  Ensure correct polarity.

  Use solar cables for the connection at the junction 

box outlet.

  Only interconnect connectors of the same type and 

manufacturer.

  Use minimum 4 mm

2

 copper wires insulated for a 

minimum of 90 °C for field connections.

Note! Module damage may occur!

  Ensure that the cabling is not under mechanical stress 

(Comply with bending radius of ≥60 mm).

  Ensure that the cables do not run between module 

and mounting rail or structure (danger of pinch).

  Do not connect modules with different orientations or 

angles of inclination in the same string.

  Ensure for a tight connection between the plugs. 

Plugs click together audibly.

click

Danger! Risk of fatal injury due to electric shock!

  Ensure that all electrical components are in a proper, 

dry, and safe condition.

  To avoid complex cabling arrangements, it is often 

advantageous to rotate some modules 180°.

  Module orientation can clearly be identified from the 

front side by the serial number and barcode labelled 
behind the module glass on the side with negative 
connection cable.

Inverter

180°

180°

SOLAR

Содержание Q.MAXX-G4 Series

Страница 1: ...Installation and operation manual Q MAXX G4 solar module series...

Страница 2: ...le stipulations such as country specific regulations for pressure equipment operational safety hazardous goods and environmental protection Regulations and requirements specific to the system Any appl...

Страница 3: ...TED WARRANTY AND MAY CREATE A SAFETY HAZARD AND RISK PROPERTY DAMAGE THIS INCLUDES IMPROPER INSTALLATION OR CONFIGURATION IMPROPER MAINTENANCE UNINTENDED USE AND UNAUTHORIZED MODIFICATION 2 Planning 2...

Страница 4: ...structural requirements Compliant with local snow and wind loads Properly fastened to the ground the roof or the fa ade Forces acting on the module are relayed to the mounting substructure Ensures su...

Страница 5: ...he system installer is responsible for the determination of location specific load requirements Ensure that the connection cables of the junction box do not run between laminate and mounting rails Mod...

Страница 6: ...number of modules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or defective insulation Ensure that the maximum...

Страница 7: ...es or junction box Carry modules upright and horizontally as shown Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall o...

Страница 8: ...may result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire op...

Страница 9: ...erformed by qualified and skilled personnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of the same type and manufact...

Страница 10: ...l Do not disconnect modules by yourself Please contact an installer or Qcells Technical Customer Service Department Dispose of modules in accordance with the local disposal regulations Ensure that all...

Страница 11: ...Remove snow and ice carefully without force e g with a very soft broom Do not scratch off dirt Module cleaning has to be done by qualified personnel according to the state of the art and taking into a...

Страница 12: ...cells Installation manual solar modules Q MAXX G4_2022 06_Rev03_AU HANWHA Q CELLS AUSTRALIA PTY LTD Suite 1 Level 1 15 Blue Street North Sydney NSW 2060 Australia EMAIL WEB TEL inquiry aus qcells com...

Отзывы: