14
INSTALLATION INSTRUCTIONS
RECEIVING—INSPECTION
Upon receiving your unit, inspect the packaging for any damage. All units are shipped on
a skid, and packaged in a triple-wall carton for added protection.
BEFORE INSTALLING
Check the unit for any damage. All OceanAire products are thoroughly inspected at the
factory and carefully packaged. If any damage is evident, contact OceanAire
IMMEDIATELY.
ELECTRICAL REQUIREMENTS
Check the nameplate located on the back of the unit to confirm the proper power is
available for the unit.
Refer to "Specifications"
section for voltage and amperage
requirements. For proper NEMA receptacles, refer to "Electrical service plug
configuration". When using extension cords, use the proper gauge cord, and check cord
voltage to the unit.
TIME DELAY FUSES/CIRCUIT BREAKERS ARE RECOMMENDED
WARNING
—OPERATING THE UNIT ON IMPROPER
VOLTAGE WILL VOID THE WARRANTY
ACCESSORIES
Verify that all accessories are correct for the model, and are installed in accordance with
all instructions.
START-UP
Install the unit in accordance with all local and state building codes, and install all
accessories. Allow for a clearance around the unit for future maintenance and/or service.
Level unit and lock casters, when available. Connect power and test the LCDI on the
power cord (if available). Power up unit, via thermostat and check for proper operation.
Refer to Thermostat Operation for more details.
Содержание PWC60
Страница 24: ...22 WIRING SCHEMATIC FOR PWC1211 PWC1811 PWC2412 and PWC3612 07182016...
Страница 25: ...23 WIRING SCHEMATIC FOR PWC6012 07182016...
Страница 27: ...25 WIRING SCHEMATIC FOR PWC3632...
Страница 28: ...26 WIRING SCHEMATIC FOR PWC6032...
Страница 29: ...27 WIRING SCHEMATIC FOR PWC3634 and PWC6034...
Страница 32: ...TECH NOTES Form EISM PWC 02272017...