English
7
TurningBox
Video line
、
Control line
、
power supply
screw
■
Installation Steps:
FIG45
FIG46
FIG47
FIG48
FIG49
First: Bracket Installation
a.Installation of pendent braket
1
、
It can be used indoor/outdoor strong door
Attention
:
a. The wall should be thick enough to fix
inflating bolt.
b. The wall should support at least 4 times
weight of the dome
c. Please be sure about airproof, waterproof
and avoid moisture if fixed outside the
house
2
、
According to the wall-mount bracket installation drawing
,
mark dimension
,
take the installing hole as moulding
board
,
Take the fixing hole under the braket as moulding
board,draw a fixing hole and drill it. Get video line,
controlling line, power source line (alarm signal line
requested by alarming function) across the braket and
make a steady one(as shown on FIG 45)
:
b.Installation of
ceiling-mount bracket
1
、
It can be used indoor/outdoor strong ceiling structure.
Attention
:
a. The ceiling should be thick enough to fix
inflating bolt.
b. The ceiling should support at least 4 times
weight of the dome
c. Please be sure about airproof, waterproof
and avoid moisture if fixed outside the
house
2
、
According to the ceiling-mount bracket installation
drawing
,
mark dimension
,
take the installing hole as
moulding board
,
Take the fixing hole under the braket as
moulding board,draw a fixing hole and drill it. Get video
line,controlling line, power source line (alarm signal line
requested by alarming function) across the braket and
make a steady one(as shown on FIG 46)
:
Second: Installation of the up-cover
1
、
Loosen the screw on the overturning box and open the
turning board.(as shown on FIG 47)
2
、
Make the lines getting through the braket enter into the
up-cover and screw the up-cover tightly to the braket.
If it is used outside, please tangle the connection point
of the screw with waterproof adhesive plaster and then
tighten up , lock and fix the screw.(as shown on FIG 48
、
49)
Indoor/ Outdoor PTZ Dome Installation