background image

Valid for Australia and New Zealand

Q.Pro-G3 · Q.Pro BLK-G3 · Q.PeaK-G3 · Q.PLUS-G3

InstallatIon and 

operatIon Manual

Содержание Q.Pro-G3

Страница 1: ...Valid for Australia and New Zealand Q Pro G3 Q PRO BLK G3 Q Peak G3 Q PLUS G3 Installation and Operation Manual...

Страница 2: ...hibited Beware of possible danger or damage Categories Danger Risk of fatal injury Attention Risk of serious injury or damage to property Note Risk of damage to product Safety Regulations The solar mo...

Страница 3: ...ility for the functionality and safety of the modules Please observe the instructions for any other sys tem components that may be part of the complete solar power system It may be necessary to carry...

Страница 4: ...to the ground the roof or the fa ade Forces acting on the module are relayed to the mounting substructure Ensures sufficient rear ventilation of the module Guarantees long term stability Has electroc...

Страница 5: ...unting options Specifications Module type Mounting option Clamping range1 Mm Allowed static load2 PA TEST LOAD acc IEC 61215 PA Q PRO G3 Q PRO BLK G3 Q PEAK G3 Q PLUS G3 CL1 Push 245 345 346 445 3500...

Страница 6: ...ts ground leaks or defective insulation Ensure that the maximum reverse current load capacity indicated in the data sheet is observed In order to limit reverse currents that may occur we recommend usi...

Страница 7: ...ginal packaging until installation Store the modules securely in cool and dry rooms The packaging is not weatherproof Danger Risk of fatal injury due to electric shock Do not install damaged modules I...

Страница 8: ...l modules in windy or wet weather Danger Risk of fatal injury due to electric shock Only use dry insulated tools Do not carry out the installation alone Only install undamaged modules and components D...

Страница 9: ...rter and the wiring with extreme caution Ensure that the modules are disconnected at the inverter prior to separation Be sure to observe the specified time intervals after switching off the inverter H...

Страница 10: ...shock Ensure that all electrical components are in a proper dry and safe condition A module with 1 160 mm long cable can be wired as a 2nd next neighbor 2nd next neighbor Wiring without a return cabl...

Страница 11: ...of performance Maintenance The system should be inspected by an installer annually to check the following all system components sit securely and are corrosion free the connection is secure and all ele...

Страница 12: ...20 Berry Street North Sydney NSW 2060 Australia TEL 61 0 29016 3033 FAX 61 0 269016 3032 EMAIL q cells australia q cells com WEB www q cells com au Subject to change without notice Hanwha Q CELLS Gmb...

Отзывы: