background image

Valid for Africa, Asia, Europe, Latin America, South America

Q.POWER-G5.1 / L-G5.1  • Q.PRIME-G5.1 / L-G5.1 SOLAR MODULES

INSTALLATION AND 

OPERATION MANUAL

Содержание Q.POWER-G5.1

Страница 1: ...Valid for Africa Asia Europe Latin America South America Q POWER G5 1 L G5 1 Q PRIME G5 1 L G5 1 SOLAR MODULES INSTALLATION AND OPERATION MANUAL...

Страница 2: ...and disposal Symbols and Labels The following symbols and labels are used throughout the Manual for ease of use SYMBOL DESCRIPTION Procedure with one or more steps Lists of items Ensure that when car...

Страница 3: ...nts prior to installation of the solar power system Your financial success depends on the fulfillment of these requirements Other applicable documents In addition to this Manual following technical in...

Страница 4: ...ces acting on the module are relayed to the mounting substructure Ensures sufficient rear ventilation of the module Guarantees long term stability Avoid the usage of different metals to prevent contac...

Страница 5: ...mp Subconstruction Mounting profile TYPE OF INSTALLATION MODULE TYPE LONG SIDE SHORT SIDE INSTALLATION WITH CLAMPS Q PRIME L G5 1 Q POWER L G5 1 INSTALLATION ON MOUNTING POINTS Q PRIME L G5 1 Q POWER...

Страница 6: ...ass Safety Factor During normal operation a module may generate a greater current and or higher voltage than that determined under standardized test conditions Please use a safety factor of 1 25 for t...

Страница 7: ...cool and dry rooms The packaging is not weatherproof DANGER Risk of fatal injury due to electric shock Do not install damaged modules Inform your distributor of any damages immediately 3 1 Safety and...

Страница 8: ...electric shock Only use dry insulated tools Do not carry out the installation alone Only install undamaged modules and components Do not modify the module e g do not drill any additional holes 3 2 Pr...

Страница 9: ...at the inverter prior to separation Be sure to observe the specified time intervals after switching off the inverter High voltage components need time to discharge DANGER Risk of fatal injury due to e...

Страница 10: ...l injury due to electric shock Ensure that all electrical components are in a proper dry and safe condition 4 3 Connection of modules 4 ELECTRICAL CONNECTION The 60 cell modules with min 1 000mm and f...

Страница 11: ...odules by yourself Please contact an installer or Q CELLS Technical Customer Service Department Dispose of modules in accordance with the local disposal regulations The symbols on the products packagi...

Страница 12: ...Qidong City Jiangsu Province China TEL 86 0 5138360 6222 FAX 86 0 5138360 6376 EMAIL sales hanwha qcells com WEB www q cells com Subject to change without notice Hanwha Q CELLS Installation_Manual_Q...

Отзывы: