18
19
INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO L-G8.X – Q CELLS
INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO L-G8.X – Q CELLS
18
Ä
Ensure that all necessary safety and functional
tests have been carried out according to
applicable standards.
Note! Module damage may occur!
Ä
Ensure that the plug connections are secured
away from any water-channelling surface.
Ä
Integrate the system into the existing lightening
protection system in accordance with the
applicable local regulations.
Warning! Fire Risk!
Ä
Do not use light concentrators (e.g. mirrors or
lenses).
Ä
Ensure that the cabling is not exposed and/or
hanging and is protected from dirt, moisture
and mechanical friction.
4 ELECTRICAL CONNECTION
4.4 AFTER INSTALLATION
Ä
No dry cleaning or use of rotating brushes.
Ä
Modules must be cleaned manually and only
with sufficient Water.
Protective Grounding
Ä
The modules must be grounded in accordance with the local
statutory regulations.
Functional grounding
•
For installations located in tropic regions (between 23.5° N
and 23.5° S) with a module tilt of < 5°, functional grounding
at the negative generator connection on the DC side must
be implemented.
Ä
Ensure that the difference of potential between the negative
generator connection and the local earth potential (e.g.
substructure, PE of the inverter) on each string in operation
mode is positive or 0 V.
Ä
Follow the directions of the inverter manufacturer and local
statutory regulations.
Ä
Only use inverters which include lincensed grounding kits.
Ä
Functional grounding has also to be implemented in installation
sites with increased salt content in the air. (e.g. close to the
sea).
DANGER!
Risk of fatal injury due to electric shock!
Ä
Do not attempt to fix any problems yourself (e.g., glass cracks,
damaged cables).
Ä
Please contact an installer or Q CELLS Technical Customer
Service Department.
Ä
Do not disconnect modules by yourself.
Ä
Please contact an installer or Q CELLS Technical Customer
Service Department.
Ä
Dispose of modules in accordance with the local disposal
regulations.
5 GROUNDING
6 FAULTS AND DEFECTS
7 DISPOSAL