8
9
INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO L-G6.3 / BFG AND L-G6.3 / BGT – Q CELLS
INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO L-G6.3 / BFG AND L-G6.3 / BGT– Q CELLS
Fig. 2:
Installation options for crystalline Q CELLS modules. All dimensions are given in inch (mm in brackets). Also observe
the maximum test loads and clamping range as specified on page 10.
The illustrated installation options apply for both horizontal and vertical module orientation.
Module
Clamp
Subconstruction
Mounting profile
2
PLANNING
2.3 MOUNTING OPTIONS
2
PLANNING
2.3 MOUNTING OPTIONS
TYPE OF
INSTALLATION
POINT MOUNTING SYSTEM
LINEAR MOUNTING SYSTEM
INSTALLATION
WITH CLAMPS
HYBRID
CLAMPING
INSTALLATION
ON MOUNTING
POINTS
3.94 - 9.84
(100 - 250)
CL5
9.84 - 19.7
(250 - 500)
NA
FB1
4 × mounting
slots
15.2
(386)
CL1
0.8-9.8
(20-250)
9.8-19.7
(250-500)
CL3
9.8-19.7
(250 - 500)
TYPE OF
INSTALLATION
POINT MOUNTING SYSTEM
LINEAR MOUNTING SYSTEM
INSTALLATION
WITH INSERTION
PROFILES
NOT PERMITTED
TRACKER
INSTALLATION
ON MOUNTING
POINTS
TRACKER
INSTALLATION
WITH CLAMPS
IP1
IP2
TB1
33.1
(840)
TC1
32.7 - 35.0
(830 - 890)
0.8 - 11.8
(20 - 300)
CL2b
NA
FB2
15.2
(386)