background image

SunEasy User Manual

Grid Connect Solar Power System

www.conergy.com.au

Summary of Contents for SunEasy 1000

Page 1: ...SunEasy User Manual Grid Connect Solar Power System www conergy com au ...

Page 2: ... 3 2 To Check Systems with the SMA Sunny Boy Inverter 10 3 2 1 Operating Mode Indication 10 3 2 2 Normal Operating Mode 10 3 2 3 Description of Operating Mode 10 4 System Maintenance 12 4 1 Maintenance Timetable 12 4 2 Trouble Shooting 12 5 System Drawings 13 6 Safe Operating Induction Certificate 14 7 Where to get help 15 8 Maintenance Checklists 16 Conergy Pty Ltd General Terms and Conditions fo...

Page 3: ...f use and ease of installation These kits have been designed to meet the requirements of the current Australian electrical and building codes including wind loading requirements Now that your system has been commissioned it should operate automatically Should you wish to know more about your system please read this manual and make yourself familiar with all safety requirements Observing all safety...

Page 4: ... the photons hit the silicon surface in the solar cells they generate electricity by transferring energy and freeing electrons In this way electricity is generated Put simply photovoltaic cells are energy converters converting the energy from sunlight into electricity Solar modules usually contain multiple number of solar cells encased in a durable casing Toughened glass is used to cover and prote...

Page 5: ...ely 5 Daily Energy Yield kWh Kit Sydney Melbourne Brisbane Perth Adelaide SunEasy 1000 4 02 4 03 4 04 4 82 4 40 Sun Easy 1500 6 02 6 05 6 06 7 22 6 59 Sun Easy 2000 8 03 8 06 8 08 9 63 8 79 Kit Alice Springs Canberra Darwin Auckland Wellington SunEasy 1000 4 33 4 16 3 84 3 88 3 56 SunEasy 1500 6 50 6 24 5 75 5 81 5 33 SunEasy 2000 8 66 8 32 7 67 7 75 7 11 Item Item Description 7 Array DC cables 8 ...

Page 6: ...orking in the vicinity of the installed solar module area when raining or when the area is still wet The installed solar power system generates electricity when exposed to the sun The generated voltage is dangerous and can be fatal The whole surface must be covered by black sheets prior to working on the system in order to ensure that no electricity is being generated Observe all safety signs inst...

Page 7: ...e solar modules In daylight hours as well as at dusk and dawn DC voltage will be present in the connected wires and cables Safe work on roofs After shutting down your system in the order above if persons are working on your roof you must make them aware that there is the possibility of a small non lethal electrical charge being present in the base frame and module frames Cleaning the solar array D...

Page 8: ...ls Operating instructions Please refer to the enclosed operating instructions for further safety information on your inverter and instructions for displaying your system performance data Warning notices Safety Signs and Instructions All safety instructions and warning signs installed with the system Must be kept in a legible condition Must not be damaged Must not be removed Must not be covered pas...

Page 9: ...y We recommend that you check the meter and inverter once a fortnight as follows Meter Check it during the day when there are no or minimal electrical appliances operating in your house The meter should be showing energy exported 3 1 To Check Systems with the Conergy WR Inverter Inverter Check the LED light on the front of the inverter LED Status Indication Steady Green Solar System Operational No...

Page 10: ...LED is blinking the Sunny Boy is in its normal operating status If all three LEDs are on the inverter is in its initialization phase which is a normal operating state as well All other signals indicate a disturbed operating state Refer to the inverter manual for more information on the different LED signal codes 3 2 3 Description of Operating Mode Standby at Night Initialisation If all LEDs are of...

Page 11: ...s rectified Green LED is on Green LED blinks 3 times per second Insulation Failure Green LED blinks once per second Red LED is permanently on With this signal the Sunny Boy indicates a grid failure which can be caused by Grid under voltage Grid over voltage Grid under frequency Grid over frequency First find out whether there is a general power shutdown If you do not find any failure the grid conn...

Page 12: ...t difference to your bill If you have not had your solar power system for the full quarter it may not have generated enough energy to make a significant difference to your bill If none of the above explains the difference and you are still concerned call your Conergy SunEasy system installer and ask for assistance to test the inverter and find out how much energy you have generated Then if require...

Page 13: ...ARGE AREA MODULES 9 CONERGY LARGE AREA MODULES Q3 20A 2P 400 VDC RATED ROOFTOP ARRAY ISOLATION NOT INCLUDED Q2 20A 2P 400 VDC RATED PV ARRAY MAIN SWITCH Q1 16A 1P 6KA C GRID DISCONNECTION INVERTER WR 1700 INVERTER WR 1700 Q3 20A 2P 400 VDC RATED ROOFTOP ARRAY ISOLATION NOT INCLUDED Q2 20A 2P 400 VDC RATED PV ARRAY MAIN SWITCH Q1 16A 1P 6KA C GRID DISCONNECTION 12 CONERGY LARGE AREA MODULES ...

Page 14: ...ch liability is incapable of being excluded or limited under any federal or state laws of Australia for any damages costs claims demands actions or other liability in respect of or arising from any injury death or from any loss of or damage to any property whether or not involving negligence or any other cause of action whatsoever caused or arising out of or incidental to or connected in any way w...

Page 15: ...roof of purchase should you wish to claim against the manufacturer warranty Installer Name License No Contact Phone No Fax No Email Address Street Address Supplier Name Contact Phone No Fax No Email Address Street Address Conergy Contact Phone No 1300 551 303 Fax No 02 8507 2220 Email Address support conergy com au Street Address Unit 6 44 48 O Dea Avenue Waterloo NSW 2017 ...

Page 16: ...o faults present Bypass diodes verified Array frame securely fixed to roof Array clamps and fastenings tight and secure No corrosion on mounting frame or roof Roof penetrations weatherproof Electrical connections secure Voc and Isc readings consistent with time of day and weather All Voc readings within 5 of each other Verify integrity of fuses circuit breakers residual current devices Inverter st...

Page 17: ...if installed tested no faults present Bypass diodes verified Array frame securely fixed to roof Array clamps and fastenings tight and secure No corrosion on mounting frame or roof Roof penetrations weatherproof Electrical connections secure Voc and Isc readings consistent with time of day and weather All Voc readings within 5 of each other Verify integrity of fuses circuit breakers residual curren...

Page 18: ...ee of corrosion Data logger if installed tested no faults present Bypass diodes verified Array frame securely fixed to roof Array clamps and fastenings tight and secure No corrosion on mounting frame or roof Roof penetrations weatherproof Electrical connections secure Voc and Isc readings consistent with time of day and weather All Voc readings within 5 of each other Verify integrity of fuses circ...

Page 19: ...older debts even if otherwise stated in the Purchaser s terms and conditions Conergy will inform the Purchaser about any such set off In the event that the Purchaser has already incurred costs and interest Conergy will be entitled to set off the payment first with costs then with any applicable interest and finally with the principal performance 3 7 The Purchaser will not cancel or amend any Order...

Page 20: ...usage or otherwise including any implied condition warranty term or representation as to the use of the Products their weight dimensions capacities colours or the correspondence of the Products with any contract description or as to merchantable quality fitness for any purpose or safety of the Products or operating performance where such performance is conditional on empirical factors or on the wh...

Page 21: ...ers some form of insolvency administration all sums then owing by the Purchaser to Conergy in relation to the Products or in relation to other goods supplied or Services performed by Conergy will become immediately due and payable and Conergy may without prejudice to any of its other rights recover and resell the Products and any other goods supplied by Conergy and may for that purpose enter upon ...

Page 22: ...ion or purchasing of new items e The prerequisite for the specified services being granted is that the module concerned has been used correctly This is only the case where it has been used in a stationary application on the mainland The guarantee does not cover maritime or mobile uses in particular f No warrantee services will be performed if the module is modified from its delivery condition as a...

Page 23: ...Notes ...

Page 24: ...For more information please contact us 1300 551 303 cost of local call Conergy Pty Ltd Unit 6 44 48 O Dea Avenue Waterloo NSW 2017 Email sales conergy com au Fax 61 0 2 8507 2220 www conergy com au ...

Reviews: