background image

6

7

INSTALLATION AND OPERATION MANUAL SOLAR MODULES DUO-G5.X – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES DUO-G5.X – Q CELLS

Installation Site

Please note the following guidelines that apply to the installation site:

• 

The modules have been tested according to UL 1703 and IEC 
61215.

• 

Solar modules are not explosion-proof and are not suitable for 
use in explosive environments.

 

Ä

Do not operate solar modules near highly flammable gas and 
vapors (e.g. gas tanks, gas stations).

 

Ä

Do not install modules in enclosed space.

 

Ä

Do not install modules in locations where they may be submerged 
in water (e.g. floodplains).

 

Ä

Do not use modules as a substitute for the normal roofing (e.g. 
modules are not watertight).

 

Ä

Do not install modules in close proximity to air conditioning 
systems.

 

Ä

Do not install modules above 13120 ft (4000 m) altitude above 
sea level.

 

Ä

In locations with increased salt content in the air (e.g. close to 
the sea) special precautions must be taken (see „Grounding“ 
and „Maintenance and Cleaning“).

 

Ä

Do not bring any chemical substance (e.g. oil, solvent etc.) into 
contact with any part of the panel. Only substances, which are 
released by Q CELLS, are allowed to be used during installation, 
operation and maintenance.

 

Ä

Any installation of modules on surfaces of water is prohibited. 
This includes installations on floating as well as pile-based 
platforms. Q CELLS may extend the coverage of its warranty 
to such installations, based on a case by case assessment of 
the system design and location. A prior written consent by the 
warrantor is required in any case.

Prevention of Shadowing Effects

Optimal solar irradiation leads to maximum energy output:

 

Ä

For this reason, install the modules so that they face the sun. 

 

Ä

Avoid shadowing (due to objects such as buildings, chimneys 
or trees).

 

Ä

Avoid partial shading (for example through overhead lines, 
dirt, snow).

Limitations

The solar modules are designed for the following applications:

• 

Operating temperatures from –40 °F to +185 °F. 

• 

Pull loads and push loads according to chapter 2.3 (‘Test Load’ 
in accordance with IEC 61215 and ‘Design Load ×1.5’ in accor-
dance with UL 1703).

• 

Installation using a mounting structure for solar modules.

Mounting Structure Requirements

Requirements for the mounting structure:

• 

Conform to the necessary structural requirements.

• 

Compliant with local snow and wind loads.

• 

Properly fastened to the ground, the roof, or the façade. 

• 

Forces acting on the module are relayed to the mounting sub-
structure.

• 

Ensures sufficient rear ventilation of the module. 

• 

Avoid the usage of different metals to prevent contact corrosion.

• 

Allows for stress-free expansion and contraction due to tem-
perature fluctuations.

 

Ä

Ensure that no additional forces are applied through the mounting 
system into the module except for the wind and snow loads. 
Additional forces and moments of torque at the mounting 
positions caused by torsions, displacements or vibrations in 
the mounting system are not allowed.

 

Ä

Ensure that the clamps and the mounting frame are compatible.

Clamp System Requirements

Use customary clamps that satisfy the following requirements:

• 

Clamp  width:  ≥ 1.5 in  (38 mm).

• 

Clamp height compliant with a 1.26 in (32 mm) frame height.

• 

Clamp depth: 0.28-0.47 in (7-12 mm). (applicable for all CL 
clamping mounting options at section „2.3 Mounting Options“)

• 

Clamps are not in contact with the front glass.

• 

Clamps do not deform the frame.

• 

Clamps that satisfy the structural requirements of the installa-
tion site.

• 

Long-term stable clamps that securely affix the module to the 
mounting frame.

Module Orientation Requirements

• 

Vertical or horizontal installation is permitted.

 

Ä

Ensure that rain and melting snow can run off freely. No water 
accumulation.

 

Ä

Ensure that the drainage holes in the frame are not covered. 
No sealing.

75°

 

Ä

Maintain the permissible angle of inclination.

• 

Minimum angle of inclination: 3°

• 

Inclination angles above 75° may be limited by 
local regulations

 

Ä

≥ 20°: self-cleaning effect 

 

Ä

Follow the directions for installation angles < 5° 
(„Grounding“, page 19) 

2  PLANNING

2.2  REQUIREMENTS

2  PLANNING

2.2  REQUIREMENTS

Содержание Q.PEAK DUO-G5 series

Страница 1: ...Valid for North America INSTALLATION AND OPERATION MANUAL DUO G5 X solar module series...

Страница 2: ...llowing regulations and standards must be upheld at all times during the installation operation and maintenance of the solar modules Installation and Operation Manual Other applicable documents such a...

Страница 3: ...ORIZED MODIFICATION Fig 1 External dimensions in inch mm and components for Q PEAK DUO G5 Q PEAK DUO BLK G5 Q PLUS DUO G5 Q PLUS DUO BFR G5 Q PEAK DUO G5 2 Q PEAK DUO BLK G5 2 Q PLUS DUO G5 2 Q PLUS D...

Страница 4: ...ns Operating temperatures from 40 F to 185 F Pull loads and push loads according to chapter 2 3 Test Load in accordance with IEC 61215 and Design Load 1 5 in accor dance with UL 1703 Installation usin...

Страница 5: ...3 88 352 5 IP1 CL1 0 9 84 0 250 17 72 21 65 450 550 2400 2400 1600 1600 CL2a with rails CL2b without rails 0 11 81 0 300 CL4 0 11 81 0 300 CL5 short side 0 9 84 0 250 long side 11 81 17 72 300 450 400...

Страница 6: ...g the maximum number of modules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or defective insulation Ensure that...

Страница 7: ...e damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT DANGER Risk of fatal inju...

Страница 8: ...result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire open c...

Страница 9: ...ersonnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Use the same inverter compatible plugs Use minimum No 12 AWG copper wires insulated for a min...

Страница 10: ...l shock or fire the frame of the module as well as any non current carrying metal parts of the system must be grounded While this section provides some information about grounding the Q CELLS frames a...

Страница 11: ...rost 0 6 MAINTENANCE AND CLEANING Free the substructure from any dirt and debris leaves bird nests etc Remove dirt with lukewarm water or alcohol based glass cleaner a broom or a soft cloth Do not use...

Страница 12: ...400 Spectrum Center Drive Suite 1400 Irvine CA 92618 USA TEL 1 949 748 59 69 EMAIL inquiry us q cells com WEB www q cells us Subject to change without notice Q CELLS Installation manual solar modules...

Отзывы: