background image

18

19

INSTALLATION AND OPERATION MANUAL SOLAR MODULES DUO-G5.X – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES DUO-G5.X – Q CELLS

18

 

Ä

Ensure that all necessary safety and functional 
tests have been carried out according to 
applicable standards.

NOTE! Module damage may occur!

 

Ä

Ensure that the plug connections are secured away 
from any water-channelling surface.  

 

Ä

Integrate the system into the existing lightening 
protection system in accordance with the 
applicable local regulations.

WARNING! Fire Risk!

 

Ä

Do not use light concentrators (e.g. mirrors or 
lenses).

 

Ä

Ensure that the cabling is not exposed and/or 
hanging and is protected from dirt, moisture and 
mechanical friction.

4  ELECTRICAL CONNECTION

4.4 AFTER INSTALLATION

 

Ä

No dry cleaning or use of rotating brushes. 

 

Ä

Modules must be cleaned manually and only with 
sufficient Water.

Functional grounding

• 

For installations located in tropic regions (between 23.5° N 
and 23.5° S) with a module tilt of < 5°, functional grounding at 
the negative generator connection on the DC side must be 
implemented.

 

Ä

Ensure that the difference of potential between the negative 
generator connection and the local earth potential (e.g. sub-
structure, PE of the inverter) on each string in operation mode 
is positive or 0 V.

 

Ä

Follow the directions of the inverter manufacturer and local 
statutory regulations.

 

Ä

Only use inverters which include lincensed grounding kits.

 

Ä

Functional grounding has also to be implemented in installation 
sites with increased salt content in the air. (e.g. close to the sea).

Protective Grounding

In order to prevent electrical shock or fire, the frame of the module 
as well as any non-current-carrying metal parts of the system must 
be grounded. While this section provides some information about 
grounding the Q CELLS frames and modules, reference should be 
made to local statutes and regulations for specific requirements 
on grounding. The U.S. National Electrical Code addresses these 
issues in Article 250. 

Proper grounding is achieved by bonding all exposed non-current-
carrying metal equipment to the appropriately sized equipment 
grounding conductor (EGC) or racking system that can be used 
for integrated grounding. 

Q CELLS frames are protected from corrosion with an anodized 
coating, which has to be penetrated in order to ensure proper 
bonding. The different methods listed below are suggested methods 
for an appropriate bond between the frame and the EGC or racking 
system (that will have to be properly grounded). The method appro-
priate for any individual installation will depend on multiple factors.

Option A: Use of a grounding lug

A listed grounding lug can be bonded to the frame using the grounding 
holes pre-drilled in the frame. These holes are marked with a ground 
symbol, as shown below on the frame section drawing: To install the 
grounding lug, follow the specified instructions of the manufacturer. 
The grounding lug should be made of stainless steel or tin plated 
metals such as aluminum to avoid corrosion. 

The grounding lug should be attached to the frame grounding hole 
using a stainless steel screw, toothed lock washer or KEPS nut (in 
order to penetrate the anodized layer) and backing nut. Care should 
be taken to avoid the use of grounding hardware of dissimilar metals, 
which may lead to corrosion.

• 

Dimensions shown are in inches.

0.177” (+0.008/-0)

±0.08

0.79”

0.47”

±0.08

5  GROUNDING

Содержание Q.PEAK DUO-G5 series

Страница 1: ...Valid for North America INSTALLATION AND OPERATION MANUAL DUO G5 X solar module series...

Страница 2: ...llowing regulations and standards must be upheld at all times during the installation operation and maintenance of the solar modules Installation and Operation Manual Other applicable documents such a...

Страница 3: ...ORIZED MODIFICATION Fig 1 External dimensions in inch mm and components for Q PEAK DUO G5 Q PEAK DUO BLK G5 Q PLUS DUO G5 Q PLUS DUO BFR G5 Q PEAK DUO G5 2 Q PEAK DUO BLK G5 2 Q PLUS DUO G5 2 Q PLUS D...

Страница 4: ...ns Operating temperatures from 40 F to 185 F Pull loads and push loads according to chapter 2 3 Test Load in accordance with IEC 61215 and Design Load 1 5 in accor dance with UL 1703 Installation usin...

Страница 5: ...3 88 352 5 IP1 CL1 0 9 84 0 250 17 72 21 65 450 550 2400 2400 1600 1600 CL2a with rails CL2b without rails 0 11 81 0 300 CL4 0 11 81 0 300 CL5 short side 0 9 84 0 250 long side 11 81 17 72 300 450 400...

Страница 6: ...g the maximum number of modules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or defective insulation Ensure that...

Страница 7: ...e damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT DANGER Risk of fatal inju...

Страница 8: ...result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire open c...

Страница 9: ...ersonnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Use the same inverter compatible plugs Use minimum No 12 AWG copper wires insulated for a min...

Страница 10: ...l shock or fire the frame of the module as well as any non current carrying metal parts of the system must be grounded While this section provides some information about grounding the Q CELLS frames a...

Страница 11: ...rost 0 6 MAINTENANCE AND CLEANING Free the substructure from any dirt and debris leaves bird nests etc Remove dirt with lukewarm water or alcohol based glass cleaner a broom or a soft cloth Do not use...

Страница 12: ...400 Spectrum Center Drive Suite 1400 Irvine CA 92618 USA TEL 1 949 748 59 69 EMAIL inquiry us q cells com WEB www q cells us Subject to change without notice Q CELLS Installation manual solar modules...

Отзывы: