background image

2

3

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO-G6.X+ – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO-G6.X+ – Q CELLS

With solar modules from Hanwha Q CELLS (hereafter referred 
to as "Q CELLS") you can directly transform the sun’s limitless 
energy into environmentally-friendly solar electricity. In order 
to ensure the maximum performance of your Q CELLS solar 
modules, please read the following instructions carefully and 
observe all guidelines. Non-compliance may result in damage 
and/or physical injury.

This installation and operation manual (hereafter also referred 
to as the “Manual”) provides instructions for the safe installation 
and operation of crystalline solar modules.

 

Ä

Please read these instructions carefully before proceeding 
with your installation.

 

Ä

Please retain these instructions for the life of the solar 
modules.

 

Ä

Please ensure that this Manual is available to the operator 
at all times.

 

Ä

This Manual should be given to all subsequent owners or users 
of the solar modules.

 

Ä

All supplements received from the manufacturer should be 
included.

 

Ä

Please observe all other applicable documents.

 

Ä

If your questions are not satisfactorily answered in the manual, 
please contact your system supplier. 

Additional information can be found on our website at www.q-cells.
com. 

Intended Use

This manual is valid for Africa, Asia, Europe, Latin America, South 
America. These instructions contain information regarding the 
safe handling and use of quality crystalline solar modules from 
Q CELLS and their installation, mounting, wiring, maintenance 
and disposal. 

Symbols and Labels

The following symbols and labels are used throughout the Manual 
for ease of use. 

SYMBOL

DESCRIPTION

 

Ä

 

Procedure with one or more steps.

• 

 

Lists of items.

Ensure that when carrying out a procedure, 
you check the results of said procedure.

Prohibited.

Beware of possible danger or damage. Cate-
gories:

• 

Danger: Risk of fatal injury

• 

Attention: Risk of serious injury or dam-
age to property

• 

Note: Risk of damage to product

Safety Regulations

In particular the installer as well as the operator of a module 
is responsible for compliance with all applicable statutory 
requirements and regulations. 

 

Ä

Unless otherwise specified by any laws or regulations, the 
following stipulations must be upheld at all times during 
the installation, operation, and maintenance of the solar 
modules: 

• 

This manual.

• 

Other applicable stipulations (such as country-specific 
regulations for pressure equipment, operational safety, 
hazardous goods, and environmental protection).

• 

Regulations and requirements specific to the system.

• 

Any applicable laws and requirements, in particular inter-
national, country specific, regional laws and stipulations 
governing the planning, installation, and operation of solar 
power systems and work on roofs.

• 

Any valid international, national and regional regulations 
governing work with direct current, especially those appli-
cable to the installation of electrical devices and systems, 
and regulations issued by the respective energy provider 
governing the parallel operation of solar power systems.

• 

Any international, country specific and regional accident-pre-
vention regulations.

• 

Other applicable stipulations provided by the relevant 
national institutions regarding safety in the installation and 
operation of electrical items. For example, in Germany the 
Bau-Berufsgenossenschaft (German institution for statutory 
accidence insurance and prevention in the building trade).

Qualified and Skilled Personnel

Both, the installer and operator are responsible for ensuring that 
the installation (including connection to the grid), maintenance 
and dismantling are carried out by trained and qualified specialists 
with approved training certificates (issued by a state or federal 
organization) for the respective specialist trade. Electrical work 
may only be performed by an officially certified tradesperson 
in accordance with the stipulations applicable in the relevant 
country with regard to standard and regulations (in Germany 
e. g. DIN standards, VDE regulations) and the stipulations of the 
local grid operator and/or energy provider.  

1  INTRODUCTION

DOCUMENT REVISION 01
This Manual is valid for Africa, Asia, Europe, Latin America and South America as of May 1st 2019 for Q.PEAK DUO-G6, Q.PEAK DUO-G6+, Q.PEAK DUO BLK-G6 and  
Q.PEAK DUO BLK-G6+ solar modules, and replaces all earlier versions.

This manual is subject to change. The data sheets and customer information valid at the point in time when the relevant module was manufactured apply to the installation, mounting, 
and maintenance procedures for the respective solar modules, as far as no updated document is provided. 

TABLE OF CONTENTS

1 INTRODUCTION 

3

2 PLANNING 

5

2.1  TECHNICAL SPECIFICATIONS 

5

2.2 REQUIREMENTS 

6

2.3  MOUNTING OPTIONS 

7

2.4  ELECTRICAL LAYOUT 

9

3 INSTALLATION 

10

3.1  SAFETY AND TRANSPORT 

10

3.2  PREPARATION OF INSTALLATION 

12

3.3  MODULE INSTALLATION 

13

4  ELECTRICAL CONNECTION 

14

4.1 SAFETY 

14

4.2  ELECTRICAL INSTALLATION SAFETY 

15

4.3  CONNECTION OF MODULES 

16

4.4  AFTER INSTALLATION 

17

5 GROUNDING 

18

FAULTS AND DEFECTS 

18

7 DISPOSAL 

18

MAINTENANCE AND CLEANING 

19

Содержание Q.PEAK DUO BLK-G6

Страница 1: ...INSTALLATION AND OPERATION MANUAL Q PEAK DUO G6 X solar module series Valid for Africa Europe LatinAmerica South America ...

Страница 2: ...ssure equipment operational safety hazardous goods and environmental protection Regulations and requirements specific to the system Any applicable laws and requirements in particular inter national country specific regional laws and stipulations governing the planning installation and operation of solar power systems and work on roofs Any valid international national and regional regulations gover...

Страница 3: ...ionsandpermitrequirements prior to installation of the solar power system Your financial success depends on the fulfillment of these requirements Other applicable documents In addition to this Manual following technical information are relevant DOCUMENT TYPE Product data sheet Packaging and transport information Fig 1 External dimensions and components for Q PEAK DUO G6 Q PEAK DUO G6 Q PEAK DUO BL...

Страница 4: ...tructure Ensures sufficient rear ventilation of the module Avoid the usage of different metals to prevent contact corrosion Allows for stress free expansion and contraction due to temperature fluctuations Ä Ä Ensure that no additional forces are applied through the mounting system into the module except for the wind and snow loads Additional forces and moments of torque at the mounting positions c...

Страница 5: ...ws and washers diameter 15 8mm or 0 62in for FB1 and FB2 mounting Module Selection Fordetailedkeyelectricaldata pleaserefertotheactualdatasheet referring to the relevant Module available at www q cells com Ä Ä For maximum energy yields mismatches of specified electric current IMPP ofmorethan5 shouldbeavoidedforallmodules connected in series Safety Factor During normal operation a module may genera...

Страница 6: ...ot install damaged modules Ä Ä Inform your distributor of any damages immediately Note Module damage may occur Ä Ä Do not stack modules Note Module damage may occur Ä Ä Do not install modules near flammable gas vapors Ä Ä Do not install modules in close proximity to air conditioning systems Note Module damage may occur Ä Ä Do not drop modules Note Module damage may occur Ä Ä Only make modification...

Страница 7: ...shock Ä Ä Only use dry insulated tools Ä Ä Do not carry out the installation alone Only install undamaged modules and components Ä Ä Do not modify the module e g do not drill any additional holes 3 INSTALLATION 3 2 PREPARATION OF INSTALLATION Option 1 Ä Ä Fasten the module with 4 clamps in the specified clamping range see Fig 2 p 7 Ä Ä Tighten clamps according to manufacturer s instructions Ä Ä Ma...

Страница 8: ...ervals specified by the inverter manufacturer after switching off the inverter Ä Ä Make sure that the plugs can not be connected unintentionally Ä Ä Beforeworkingonthecontacts checkthemforsafetyextra low voltage Danger Risk of fatal injury due to electric shock Ä Ä Never open the junction box Ä Ä Do not remove bypass diodes Danger Risk of fatal injury due to electric shock Ä Ä Never touch live con...

Страница 9: ...geous to rotate some modules 180 Ä Ä Module orientation can clearly be identified from the front side by the serial number and barcode labelled behind the module glass on the side with negative connection cable EN Inverter 180 180 SOLAR Ä Ä Ensure that all necessary safety and functional tests have been carried out according to applicable standards Note Module damage may occur Ä Ä Ensure that the ...

Страница 10: ...tified personnel Ä Ä The time intervals and extent of the inspection can depend on local circumstances e g salt ammonia content in the air high humidity etc The customer operator must inform himself about time intervals and extend of necessary inspections Ä Ä Inspectionshavetobeperformedespeciallyafterextraordinary events e g storm hail high snow loads etc Ä Ä During the inspections it has to be c...

Страница 11: ...lee 17 21 06766 Bitterfeld Wolfen Germany TEL 49 0 34946699 23222 FAX 49 0 34946699 23000 EMAIL sales q cells com WEB www q cells com Subject to change without notice Q CELLS Installation manual solar modules Q PEAK DUO G6 X _2019 06_Rev01_EN ...

Отзывы: